![Royal garden OUB10A001 Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/royal-garden/oub10a001/oub10a001_assembly-instructions-manual_1494645005.webp)
5
Slide the side panel “I” downwards between
the corned connectors “H”
Step5:Preparing the sand in the umbrella base
Place the sand bag “K” into the umbrella
base as the picture shows
For stability the recommended minimum
weight of sand to be place into each sand
bag is 88 LBS for A total of 176 LBS.
After filling with sand only, close the pouch
by ensuring the Velcro is sealed .Lock the
two section of the sand bag “K” together.
Step6:Attaching the upper base-1 and 2 cover with the base side panels
Check the locker first to make sure it is at the
right position as the picture shows.
Assemble the upper base cover
“L” with the
base side panels “L” as the picture shows.
Make sure the upper base cover “L” is
placed properly for easy locking.
Use the end side of the wrench “CC”
clockwise to lock all 8 locks
.
Embed rotating cover “M” into the base
tube “C” and tighten it clockwise
.
Step7:Attaching the metal sheet and the tube rim to the base tube