
ROXELL - 008- 3509
VITOO IN LINE -- INSTALLATION INSTRUCTIONS
III--39
TO INSTALL THE POULTRY PERCH GUARD
FIGURE 80.
Position of the anchor brackets.
next to the hopper
every 3 feeder tubes when 3 or 4 pans/tube
every 2 feeder tubes when 1 or 2 pans/tube
3 feeder tubes
next to the control unit
Unroll the cable for poultry perch between 2 anchor brack-
ets.
FIGURE 81.
Fix cable with the
clamp supplied
Click the cable into the upper cap of each pan up to the
next cable connection.
FIGURE 82.
START NEXT TO THE HOPPER
Make a double loop around the central notch of the an-
chor bracket.
EVERY X FEEDER TUBES (See Im. 80.)
FIGURE 83.
FIGURE 84.
Install a spring in the central notch of the second anchor
bracket.
Firmly tighten the cable.
Make a loop through the spring’s eye. Clamp.
Proceed the same
way for the next tubes etc...
Cut the surplus cable.
POULTRY PERCH GUARD AND FEEDER LINE MUST BE EARTHED !!!
Содержание Vitoo In Line
Страница 6: ...VITOO IN LINE TABLE OF CONTENTS ROXELL 008 3510 ...
Страница 7: ...I 0 PART I INSTRUCTIONS FOR THE USER ...
Страница 8: ...ROXELL 008 2111 VITOO IN LINE INSTRUCTIONS FOR THE USER I 1 ...
Страница 24: ......
Страница 26: ...ROXELL 008 3510 VITOO IN LINE COMPONENTS II 2 GENERAL LAY OUT ...
Страница 44: ...ROXELL 008 0512 VITOO IN LINE COMPONENTS II 20 BAG HOPPER PARTS ...
Страница 53: ...PART III INSTALLATION INSTRUCTIONS ...
Страница 54: ...ROXELL 008 4403 VITOO IN LINE INSTALLATION INSTRUCTIONS NOTES ...
Страница 56: ......
Страница 58: ...ROXELL 008 2111 VITOO IN LINE INSTALLATION INSTRUCTIONS III 4 GENERAL LAY OUT ...