background image

         15mm

         16mm

         16mm

         15mm

         15mm

         15mm

Front right leg has cleat

5. Centre track

Join the two halves of the centre track and pulley mechanism secure in place using 2 x 16mm bolts as shown. Position the centre track centrally on top of the main
assembly and secure using 2 x 16mm bolts to the front outer rafter and 2 x 16mm bolts to the back outer rafter.

         16mm

4. Outer track and rafters to legs

Attach the front outer rafter to the front legs as show using 4 x 15mm long head bolts per leg. Securing through the rafter into the leg. Attach the back outer rafter in
the same way to the back legs. Join the 2 sections together with the outer track sections, attach the track sections using 4x15mm long head bolts at each end.

Содержание SS227B

Страница 1: ... 1 Front left right back leg 2 2 Front right leg 1 3 Back left leg 1 4 Front left outer rafter half 1 5 Front right outer rafter half 1 6 Back right outer rafter half 1 7 Back left outer rafter half 1 8 Centre track and pulley mechanism 1 9 Front left back right outer track half 2 10 Front right back left outer track half 2 11 Centre rafter half with coupling 4 13 fixed canopy tubes 2 14 Canopy tu...

Страница 2: ... for each join Outer track sections have the channel for the runner to slide and 4 holes at the end Outer track sections have the channel for the runner to slide and 4 holes at the end 3 Front and back outer rafters 16mm 16mm Outer rafter sections have 4 holes at the ends Connect the outer rafters to the outer rafters with coupling Insert the coupling and secure in place using 3 x 16mm bolts for e...

Страница 3: ... using 2 x 16mm bolts to the front outer rafter and 2 x 16mm bolts to the back outer rafter 16mm 4 Outer track and rafters to legs Attach the front outer rafter to the front legs as show using 4 x 15mm long head bolts per leg Securing through the rafter into the leg Attach the back outer rafter in the same way to the back legs Join the 2 sections together with the outer track sections attach the t...

Страница 4: ...es against the inside of the back outer rafter and secure using 2 x 25mm bolts per tube 25mm 16mm 80mm 6 Centre rafters Join each of the four centre rafter halves with coupling to centre rafters Secure the rafter half using 2 x 16mm bolts Place the rafters on the assembly and secure in place using 2 x 80mm bolts per rafter 80mm ...

Страница 5: ...on of strong winds and during the winter period The polyester canopy must be completely dry before storage Eyelets in the canvas are drain holes to prevent water collecting and stretching the canvas Maintenance To clean the polyester canopy sponge clean using a mild soap and water solution and leave to dry naturally Do not use bleach acid or other solvents Do not machine wash Do not tumble dry Saf...

Отзывы: