background image

No.

Fixing Kit

Qty.

9

50mm screw

17

10

30mm nail

28

11

10mm felt nail 

20

No.

Components

Qty.

1

Upright 2

2

Side panel

1

3

Back  panel

1

4

Roof panel

1

5

Felt batten (905mm)

2

6

Roof rafter (645mm)

2

7

Roof felt roll

1

8

Bargeboards

2

2

1

3

4

5

6

2014 © Rowlinson Garden Products Ltd

7

Before assembly

We recommend that time is taken to read the instructions before

starting assembly, then follow the easy step by step guide.
The instruction sheet is only a guide to the assembly.
Certain items may not be shown to scale. 

Check all components prior to assembly

Drill all components where indicated.

This product should be assembled by no less than two people.

Never attempt to erect the assembly in high winds.

Recommended tools for assembly

Cross head screw driver           

Drill with 2mm diameter drill bit

Step ladder

x 2

Drill

8

ROWLINSON GARDEN PRODUCTS LIMITED

Green Lane

Wardle, Nr. Nantwich

Cheshire

CW5 6BN

Help Line (Normal Office Hours)  01829 261 121

English SS349

Assembly Instructions

4x3 Shed Lean to/log store

We constantly improve the quality of our products, occasionally the
components may differ from the components shown and are only
correct at time of printing. We reserve the right to change the
specification of our products without prior notice.

IMPORTANT NOTE:

This instruction is for use in
conjuction with the 4x3 Shed
assembly instruction     (SS276  ).
The lean to can be fitted to
either side of the shed.

Side panel

Back panel

50mm

50mm

50mm

50mm

50mm

3. Attaching walls

Position the walls under the roof. Secure the back wall to the side of the shed
using 3 x 50mm screws. At the front and rear screw through the roof rafter
into the uprights as shown using 1 x 50mm screw for each upright. 

10mm

10mm

10mm

10mm

10mm

4. Roof felt      

Lay the lean to roof felt over the lower part of the long roof. Ensure the is
equal overhang front and rear. Fold over the felt so it covers the felt batten at
the bottom edge of the roof and secure to the batten using 10 x 10mm felt
nails. Tension the felt up the roof and secure the other edge with 3 x 10mm
to the roof. Lay the shed roof felt over the short side of the roof. Fold over
the felt so it covers the felt batten and secure to the batten using 10 x 10mm
felt nails. Tension the felt up over the roof apex and secure the other edge
using 10 x 10mm felt nails. Dress the felt down over the front and back and
secure using 11 x 10mm felt nails. If necessary trim off any excess felt . 

5. Bargeboards and finials

To the front and rear of the shed, secure the bargeboards so that the top edge
is flush with the roof line and the two boards meet evenly at the apex secure
using 3 x 30mm nails per board. Attach a finial at the roof apex, over the joins
between the bargeboards using 2 x 30mm nails.

30mm

30mm

30mm

1. Back and side panels

Secure an upright to each edge of the side panel using 3 x 50mm screws per
leg, screw through the panel frame into the legs. Then secure the side panel
to the leg and back panel as shown using 3 x 50mm screws. It is recommended
to drill pilot holes for all screws with a 2mm drill bit before assembly.

2mm

Drill

2mm

Drill

2mm

Drill

50mm

30mm

30mm

2. Roof panel

Using 5 x 30mm nails fix the felt battens flush with the long each edges of the
roof panel. Then attach the roof rafters between the felt battens flush to the
short roof edges using 4 x 30mm nails. Screw the panel to the felt batten on
the shed using 3 x 50mm screws. 

Отзывы: