7. Roof panels

Lift the rear roof panels into position at the back of the building, hooking the roof battens over the upper roof purlins, Ensure these panels overhangs the back of the building
by 55mm. Secure each panel to the roof purlins and the top frame of the side walls using 6 x 35mm screws per panel. Working towards the front of the building, hook the
centre roof panels over the upper purlins and with them pushed right up against the rear roof panels, secure each panel with 6 x 35mm screws. Add the front roof panel and
secure in the same way. To the inside of the roof fit the apex cover to the two centre purlin using 6 x 35mm screws.

Side view of fitting the roof

Screw through roof into roof
purlin and the top frames of the
side panels.

35mm

10mm

Felt

nails

10mm

Felt

nails

45mm

10mm

Felt

nails

Felt batten on the
front roof panels.

10mm

Felt

nails

10mm

Felt

nails

8. Roofing felt

Place a length of felt over half of the roof. At the front and along the lower edge of the roof leave an overhang of felt of at least 45mm to cover the felt battens. Fold down
the felt along the lower edge and secure to the felt batten using 30 x 10mm felt nails evenly spaced. Tension the felt over the roof and secure along the upper edge using
6 x 10mm felt nails. Repeat this for the second piece of felt on the other half of the roof. Once the two pieces of felt are in place take the 3rd felt piece and place over the
apex of the roof making sure it sits centrally over the roof ridge and overlaps the other two felt pieces, attach using 30 x 10mm felt nails evenly spaced, along the two long
edges of the ridge felt. Dress down the ends of the felt and at the front attach to the felt batten with 6 x 10mm felt nails. Repeat at the back of the building. Once secured
trim off excess felt.

45mm

Roof purlin

Side panel top frame

Upper edge

Lower edge

Apex cover

Apex panel

Apex panel

Stagger screws as shown, screw
through the apex cover into the
purlin.

View from inside the building
looking up at the roof apex

Important

Make sure the two

roof panels at the

door end have front

felt battens.

Side view of roof panel

Roof batten is set 12 mm from the
end of the panel, it is this that
must hook over the top roof purlin

Felt batten is flush with
the end of the panel.

35mm

50mm

50mm

Drill

It is recommended to drill pilot
holes for these screws with a
3mm drill bit before assembly.

9. Lattice wing panels

Position a lattice wing side panel in the corner of the roof and front panel. Ensure the wing is flush to the outer edge of the building and secure using 2 x 50mm screws,
screw through the frame of the wing into the front panel, fix to the roof felt batten using 2 x 50mm screws as shown. Attach the other wing panel in the same way.

Drill

It is recommended to drill
pilot holes for these screws
with a 3mm drill bit before
assembly.

50mm

Felt batten

Fr

o

n

t p

an

e

l

roof overhang

6. Roof purlins

Insert the four roof purlin into the rebates in the apex sections. Fix in place at the ends of the purlin, using 2 x 50mm screws per purlin. Screw through the purlin and
into the frame of the apex panels.

Rear roof panels must overhang

the back of the building by 55mm.

Important

55mm

Important