Roverpet WB1844DSF Скачать руководство пользователя страница 2

               

Roverpet

   20 Kiji Dava Circle   Prescott, Arizona  86301   

1-800-658-5925

   

rover@roverpet.com

 

 

Page 2 of 3 

 

 

                                                          

 

5.)  Lay floor trays side-by-side into the bottom of the whelping box with the frame pipes facing up to allow connection to the 

side panels.  

6.)  Connect floors to side panels with supplied #250 floor clips in the following manner: 

One

 in the middle of each bottom bar of the #118 panels. 

Two

 at the extreme ends of the #D18 door frame bottom bar (do not place in the door opening). 

Three

 equally spaced across the mid-span of the floor frames. 

 

7.)  Assemble the Roverpet puppy rails by inserting the cross-bars into the through-drilled holes in the main bars and then 

insert the four legs into the blind holes drilled into the bottom of the main bars; be sure to orientate the main bars so that 
all four blind holes are facing the same direction. Refer to the three photos below for visual clarification. 

 
 
 
 
 
 
 
 

8.)  Insert the Roverpet puppy rail assembly into the Roverpet whelping box with the drilled and end-notched leg bars 

running across the door opening for correct fastening orientation, as shown in the left photo below; partially engage the 
two notched ends of the leg bars with the second inward-most vertical bars of the #118 panels as shown in the right 
photo below. 

 
 
 
 
 
 
 
 

9.)  Proceed with lowering the Roverpet puppy rail assembly into the opposite side of the Roverpet whelping box and 

completely engage the notched ends of the leg bars with the small vertical bars of the #118 panels. Supporting the small 
vertical bars with one hand while simultaneously pushing the leg bars towards the #118 panel with your other hand will 
help to more easily facilitate the connection. Refer to the two photos below for visual clarification. 

 
 
 
 
 
 
 
 

10.)  Once fully engaged with the vertical bars of the #118 panels, push the puppy rail assembly completely to   

 the bottom of the whelping box and seat it against the floor trays. 

11.)  Starting on the right side of the #D18 door (looking from the outside of the whelping box),feed the #DPK    Designer 

Puppy Keeper, with the label side facing out, between the large outer pipe of the door frame and the small diameter 
vertical bar adjacent to it (left photo below). Feed the fabric across the back of the door and pull it back through the 
same position on the other side of the door (right photo below).  

 
 
 
 
 
 
 

Отзывы: