roundhouse TALIESIN Скачать руководство пользователя страница 7

Before  attempting  to  fill  the  gas  tank,  make  sure  that  the  gas 
control valve is closed by turning it clockwise. 
The  filler  valve  for  the  gas  tank  is  on  top  of  the  tank  under  the 
dummy coal load. Invert the gas canister and place its nozzle over 
the gas filler valve. Support the tank from underneath and press the 
canister down. The gas  will be heard hissing as it enters the tank 
and  a  small  amount  will  escape  around  the  valve.  This  is  quite 
normal and is the tank venting as the liquid enters. After about 20 
to 30 seconds, liquid gas will emerge from the valve showing that 
the tank is full. Remove the canister immediately. 
 

3) FILLING THE BOILER 

There are two methods of filling the boiler. 
 

3a) Quick filling when cold. 

The  brass  steam  dome  can  be  lifted  completely  off  to  access  the 
filler plug. The brass dome is a substantial and heavy item, being 
turned from solid brass. Care is needed when removing the dome, 
especially  when  the  engine  is  hot,  as  the  dome  itself  will  be  hot. 
Take care not to drop the dome onto the locomotive, as the weight 
of it may damage the model. 
 
Remove  the  filler  plug  /  filler  valve  assembly  by  unscrewing  it. 
Using the 60ml syringe and plastic tube supplied, fill the boiler fully 
to  the  top  with  clean  water.  Distilled  water  is  recommended  if 
available. As an alternative in soft water areas, clean tap water can 
be used. Also, rain water or water from a dehumidifier may be used 
provided that it is adequately filtered. 
 
Many people use rain water passed through a wine or coffee filter 
to  remove  any  particles  or  debris.  Do  not  use  deionised  water  as 
this type of water in the long term, may cause damage to the boiler 
and  fittings.  There  has  to  be  a  space  above  the  water  to  allow 
steam  to  be  raised  so,  insert  the  end  of  the  plastic  pipe  into  the 
boiler  and  withdraw  30ml  of  water  with  the  syringe.  Replace  the 
filler plug finger tight, and then place the brass dome over it. Note 
that  there  is  a  rubber  ‘O’  ring  around  the  body  of  the  filler  plug 
which helps retain the dome during normal operation. 

Содержание TALIESIN

Страница 1: ...Owners Handbook For the Taliesin Locomotive TALIESIN...

Страница 2: ...ded for use out of doors and must only be operated in a well ventilated area Whilst the locomotive is in use hot gasses are exhausted up the chimney and excess steam frequently blows off through the s...

Страница 3: ...ing using the Pump bottle Page 8 4 Lubrication Page 8 5 Lighting the Burner Page 9 Running the locomotive Page 10 Water top up system Page 12 Storage between operating sessions Page15 Trouble shooting...

Страница 4: ...down each time you raise steam screws and nuts have a tendency to stretch and loosen a little so you will also need to make regular checks and nip up any that become loose Most are quite visible and...

Страница 5: ...COMOTIVE a Boiler filler and top up valve dome removed b Safety valve c Steam regulator d Gas regulator e Gas filler valve f Gas jet holder g Pressure gauge h Water gauge i Lubricator filler cap j Lub...

Страница 6: ...storage This will help to prevent any loss of battery performance Note that the batteries in the transmitter are not re chargeable and are housed in the base of the unit 2 FILLING THE GAS TANK The fil...

Страница 7: ...especially when the engine is hot as the dome itself will be hot Take care not to drop the dome onto the locomotive as the weight of it may damage the model Remove the filler plug filler valve assemb...

Страница 8: ...should be carried out before each operating session There are two types of lubrication required The external moving linkages and bearings are lubricated with a medium oil such as motor engine oil and...

Страница 9: ...off immediately or damage may result Move the locomotive to another location before lighting Butane is heavier than air and small pockets of gas can collect around the locomotive during filling To li...

Страница 10: ...s unnecessary RUNNING THE LOCOMOTIVE If you are familiar with running Roundhouse steam locomotives you may find Taliesin a little different All models have a unique feel and this single Fairlie is no...

Страница 11: ...until the loco comes to a halt Should the water expire before the gas is fully used the pressure will drop rapidly and the loco will stop Check the pressure gauge and water gauge if there is no steam...

Страница 12: ...ired simply release the reversing control on the transmitter which will spring back into mid gear and halt the train Then close the regulator Always ensure that the regulator is closed before switchin...

Страница 13: ...ngine in steam for long periods Once the locomotive is in operation as detailed in the previous sections water must be added to the boiler from time to time during the run as follows Fill the water pu...

Страница 14: ...little when the pipe is removed If this does happen re connect the pipe and give a further pump or two of water to clear it As the filler valve sits vertically on top of the boiler a small amount of...

Страница 15: ...e pipework Ensure all controls are closed and the valve gear in mid gear Ensure that radio control equipment is switched off and if the engine is not to be used for some time remove all batteries Peri...

Страница 16: ...hould be attended to If nipping up the retaining screws does not stop a steam leak a service kit is available which includes replacement gaskets and seals and full instructions for fitting Valve chest...

Страница 17: ...ries should be used and re charged at least once every 4 to 6 weeks Always fully re charge the batteries after use Failure to do this may damage the batteries so that they can no longer be charged and...

Страница 18: ...cient for ignition to take place Opening too much too soon may extinguish the flame until the burner reaches normal operating temperature The tiny jet in these units can become blocked by small partic...

Страница 19: ...body which may need lubrication from time to time if the control becomes spongy in operation making precise gas control difficult As stated in the lighting instructions earlier the full range of adjus...

Страница 20: ...the filler valve body can be carefully removed by sliding it off Clean the tube and valve body and replace the tube If the tube is damaged a replacement is available from the Roundhouse factory Replac...

Страница 21: ......

Страница 22: ...ve to ten years 1 hydrostatic pressure test to not less than 1 5 and not more than 2 times the maximum working pressure Boiler The boiler is fitted with a safety valve to prevent the steam pressure ri...

Страница 23: ...23 Gas Burner 1 Superheater Pipe 2 Lubricator Pipe 3 Gas Jet Holder retaining screw 4 Gas Jet 5 Gas Jet Holder 6 Gas Pipe 7 Gas Burner fixing screw 8 Air Inlet Holes...

Страница 24: ...eatley Doncaster DN1 2TF England Telephone 01302 328035 Fax 01302 761312 email support roundhouse eng com SERVICE AND PARTS If you any problems arise with this model which are not covered in these ope...

Отзывы: