roundhouse SR&RL 24 Скачать руководство пользователя страница 3

CONTENTS 

 

Tool kit. 

   

 

 

 

 

 

 

Page  4 

 

  Running in.   

Page  4 

 

  Access to controls. 

Page  4 

 

  Coupling engine and tender. 

Page  4 

 

  Identification of parts of the locomotive. 

Page  5 

 

  Preparations for operation. 

Page   6 

     

1. Filling the Gas Tank. 

Page   6 

     

2. Filling the Boiler. 

Page   7 

     

3. Lubrication. 

Page   8 

   

  4. Lighting the Burner. 

Page   8 

 

  Running the locomotive. 

Page   9 

 

  Driving manually. 

Page  10 

 

  Driving by radio control. 

Page  11 

 

  Storage between operating sessions. 

Page  12 

 

  Altering wheel gauge. 

Page  13 

 

  Trouble shooting & maintenance. 

Page  13 

    

Steam leaks. 

Page  14 

    

Regulator not shutting. 

Page  14 

    

Radio control. 

Page  14 

    

Gas system. 

Page  15 

 

   Boiler and Gas Tank Certificate, 

Pages  17 & 18   

  (

EC Declaration Of Conformity

). 

 

Service and parts. 

Page  20 

SR&RL Instruction Booklet 

Содержание SR&RL 24

Страница 1: ...Owners Handbook For the Sandy River and Rangely Lakes 24 Locomotive SR RL 24...

Страница 2: ...hard times continued and eventually in 1935 the line closed for the last time In 1936 a public auction was held and the remaining equipment was sold what wasn t sold was scrapped No 24 was the second...

Страница 3: ...tion Page 8 4 Lighting the Burner Page 8 Running the locomotive Page 9 Driving manually Page 10 Driving by radio control Page 11 Storage between operating sessions Page 12 Altering wheel gauge Page 13...

Страница 4: ...d nip up any that become loose Most are quite visible and easy to get to however if there is any steam leaking from the valve chests on top of the cylinders refer to the Trouble Shooting section ACCES...

Страница 5: ...not included with the model Fuel Butane gas See Filling the gas tank Water See Filling the boiler Lubricating oil See Lubrication 5 IDENTIFICATION OF PARTS OF THE LOCOMOTIVE Radio controlled version i...

Страница 6: ...pair of gloves is provided in the tool kit for your protection Always have to hand either a fire extinguisher or wet cloth when operating the model PREPARING FOR OPERATION The locomotive must be serv...

Страница 7: ...dummy steam dome on top of the boiler The dummy steam dome is a substantial and heavy item and care is needed when removing it especially when the engine is hot as the dome itself will be hot Take car...

Страница 8: ...ll run out through the drain screw Tighten the drain screw and refill with the steam oil supplied then replace the cap Take time filling the lubricator especially when cold as the oil takes time to ru...

Страница 9: ...m raising Open the gas regulator slowly to about one full turn The full range of adjustment closed to fully open is achieved within the first full rotation of the gas regulator knob any more is unnece...

Страница 10: ...time it becomes empty and keeping the boiler full of water by means of the water pump bottle but lubrication must not be forgotten The lubricator has a duration of around 30 40 minutes so this must b...

Страница 11: ...quite smooth once the cylinders etc have reached their normal operating temperature To reverse the locomotive close the regulator to bring it to a halt move the reversing lever over and open the regu...

Страница 12: ...adio receiver is never on when the transmitter is switched off and so should always be under your control When the batteries are getting low a poor signal between transmitter and receiver will result...

Страница 13: ...ly spaced relative to each side frame To allow for variation in track standards from different manufacturers the back to back measurement can be altered from that set by the gauge supplied The driving...

Страница 14: ...els The steam regulator seating and seal can after a period of time become worn or compressed so that when the lever on the radio control is fully closed the locomotive still moves To overcome this a...

Страница 15: ...aking the burner difficult to light burn weakly at normal operating temperatures burn in the smokebox or fail completely If any of these should happen clean out the jet as follows On very cold days a...

Страница 16: ...more than this for maintenance purposes and when the tank is empty and there are no naked lights nearby To lubricate it remove the knurled knob which is retained by a M3 socket grub screw M1 5 AF All...

Страница 17: ...CO LTD Model S R R L 24 Serial No Signe R Loxley director Dated Vessel for Group 1 gasses and asso ciated pipe work and fit tings Stea m Ge ner ator and as socia Model Type 10 boiler Serial No Test da...

Страница 18: ...e to ten years 1 hydrostatic pressure test to not less than 1 5 and not more than 2 times the maximum working pressure Boiler The boiler is fitted with a safety valve to prevent the steam pressure ris...

Страница 19: ...a flexible water pipe to a check valve on top of the boiler No special maintenance is required though the end of the plastic tube will require trimming back occasionally As it is being pushed into a t...

Страница 20: ...hould first contact their local dealer Your ROUNDHOUSE dealer is If your dealer is unable to help please contact the Factory directly ROUNDHOUSE ENGINEERING CO LTD Units 6 10 Churchill Business Park C...

Отзывы: