14. Lightly grease and install the 12mm sleeves supplied on the bottom and top of the bent sway bar link.
15. Install the upper part of the new link in the hoop bracket with the 12mm bolts & flanged nut.
See Photo 5.
Tighten
using a 18mm wrench.
Note: The bolt must be installed with the nut to outside to provide adequate
clearance to the frame.
16. Use the factory hardware to install lower end of link.
See Photo 6
. Place large face washer between bushing
and nut.
17. On the front track bar mount. Mark as shown in
Photo 7
straight over 3/4” from the center of the stock hole and
mark using punch. Drill the new track bar hole using a
7/16” drill bit making sure to keep drill level. Do not
reinstall the track rod at this time. This will be preformed
with the vehicle on the ground.
Note:
This step will not
be performed if the optional Adjustable Track Rod was
purchased. If installing the optional track rod, please
wait until the vehicle is on the ground to center the front
end.
18. Repeat installation on the opposite side of the vehicle.
19. Install the tires, wheels and lug nuts and tighten to
factory specifications. Lower the vehicle to the ground.
20. Install the front track rod with the factory hardware.
Tighten using a 15mm wrench.
PHOTO 6
Note:
Direction of bolt
on uppers sway
bar mount.
PHOTO 5
Front Sway Bar Installation
Front Sway Bar Installation
Note: Direction of
bolt (Nut to Out-
side of Vehicle)
PHOTO 7
Front Track Bar Relocation