and properly conform to all conditions in order for the operator to be sure that the product
works as intended. Damaged safety features or functional parts should be properly repaired or
replaced by a qualified organization/ service shop.
2.6
Mains Power Supply
Utility suppliers’ wiring requirements, VDE provisions, occupational safety rules, DIN / CEN
regulations, and national codes have to be respected.
Mains power fuse protection should be max. 10 A.
The product has to be protected against rain and humidity.
3
Service
3.1
Maintenance and Repair
As the product is used in applications that are sensitive to safety considerations, it may be
serviced and repaired only by the manufacturer or its duly authorized and trained partners.
Thus, constantly high standards of operation quality and safety are maintained.
Failure to comply with this provision will dispense the manufacturer from any warranty
and liability claims for the product, including any consequential damage.
When serviced, the unit is upgraded automatically to the technical specifications of the product
at the moment it is serviced, and we grant a three-month functional warranty on the serviced
unit.
We recommend having the product serviced at least every twelve months.
In Germany, do not neglect that the occupational safety check-up under rule BGV A3 is
mandatory!
3.2
Transport, Storage, Shipment
The product is shipped in a cardboard box. Store the product in the box dry and protected
against humidity.
When shipped, the product should be placed into the box at any time.
4
Principle of Operation
The ROWELD ROFUSE Sani 160 welding unit allows using electrofusion fittings to join
discharge lines routed indoors and made of PE, of the makes Geberit, Akatherm-Euro, Coes,
Valsir, Waviduo, and Vulcathene-Euro.
The microprocessor-controlled unit
• controls and monitors the welding process in a fully automated fashion,
• determines welding duration depending on ambient temperature,
• indicates all information with three LEDs and a seven-segment display screen.
5
Operation
5.1
Turning the Welding Unit On
After connecting the power supply cord to 230 V mains power, turn the welding unit on at
the On/Off switch. The unit then performs an auto-test. All three LEDs light up briefly and
simultaneously to indicate that the unit is ready for operation. Furthermore, the seven-segment
characters show the welding mode
H00
for approximately 1 second. After this, both the LEDs
and the screen characters go off again.
5.2
Connecting the Electrofusion Fitting
Connect the connection terminals to the fitting and check for proper fit. The contact surfaces of
the connection terminals and the fitting have to be clean. Dirty terminals may lead to improper
welding and also to overheated and fused terminal plugs.
After the fitting was connected, the yellow LED (Fitting connected) lights up. At the same time,
the screen displays the welding time. The welding process can now be started by pressing the
START key.
The welding time is counted down from about 80 s.