To prevent the outdoor unit from falling
over

1

Prepare  2  cables  as  indicated  in  the  following  illustration  (field
supply).

2

Place the 2 cables over the outdoor unit.

3

Insert  a  rubber  sheet  between  the  cables  and  the  outdoor  unit
to prevent the cable from scratching the paint (field supply).

4

Attach the cable’s ends. Tighten those ends.

3.3

Connecting the refrigerant piping

DANGER: RISK OF BURNING

3.3.1

To connect the refrigerant piping to the
outdoor unit

1

Connect the liquid refrigerant connection from the indoor unit to
the liquid stop valve of the outdoor unit.

a

b

c

a

Liquid stop valve

b

Gas stop valve

c

Service port

2

Connect  the  gas  refrigerant  connection  from  the  indoor  unit  to
the refrigerant stop valve of the outdoor unit.

3.4

Checking the refrigerant piping

3.4.1

To check for leaks

NOTICE

Do NOT exceed the unit's maximum working pressure (see
"PS High" on the unit name plate).

NOTICE

Make  sure  to  use  a  recommended  bubble  test  solution
from  your  wholesaler.  Do  not  use  soap  water,  which  may
cause cracking of flare nuts (soap water may contain salt,
which  absorbs  moisture  that  will  freeze  when  the  piping
gets  cold),  and/or  lead  to  corrosion  of  flared  joints  (soap
water  may  contain  ammonia  which  causes  a  corrosive
effect between the brass flare nut and the copper flare).

1

Charge the system with nitrogen gas up to a gauge pressure of
at  least  200  kPa  (2  bar).  It  is  recommended  to  pressurize  to
3000 kPa (30 bar) in order to detect small leaks.

2

Check  for  leaks  by  applying  the  bubble  test  solution  to  all
connections.

3

Discharge all nitrogen gas.

3.4.2

To perform vacuum drying

1

Vacuum the system until the pressure on the manifold indicates
−0.1 MPa (−1 bar).

2

Leave as is for 4-5 minutes and check the pressure:

If the pressure…

Then…

Does not change

There is no moisture in the
system. This procedure is
finished.

Increases

There is moisture in the
system. Go to the next step.

3

Evacuate  for  at  least  2  hours  to  a  pressure  on  the  manifold  of
−0.1 MPa (−1 bar).

4

After  turning  OFF  the  pump,  check  the  pressure  for  at  least
1 hour.

5

If you do NOT reach the target vacuum or cannot maintain the
vacuum for 1 hour, do the following:

▪ Check for leaks again.
▪ Perform vacuum drying again.

NOTICE

Be sure to open the gas stop valve after piping installation
and vacuuming. Running the system with the valve closed,
the compressor may break down.

3.5

Charging refrigerant

3.5.1

To determine the additional refrigerant
amount

If the total liquid

piping length is…

Then…

≤10 m

Do NOT add additional refrigerant.

>10 m

R=(total length (m) of liquid
piping⁠–⁠10 m)×0.020

R=Additional charge (kg)(rounded in units
of 0.1 kg)

Содержание RVLQ05CAV3

Страница 1: ...Installation manual ROTEX HPU hybrid outdoor unit English Installation manual ROTEX HPU hybrid outdoor unit RVLQ05CAV3 RVLQ08CAV3...

Страница 2: ...sleduj c m norm m nebo normativn m dokument m u skladu sa slijede im standardom ima ili drugim normativnim dokumentom ima uz uvjet da se oni koriste u skladu s na im uputama 16 17 18 19 20 21 22 23 2...

Страница 3: ...ete set consists of General safety precautions Safety instructions that you must read before installing Format Paper in the box of the indoor unit Heat pump module installation manual Installation ins...

Страница 4: ...a If the coating on the fastening area is stripped off the nuts rust easily a 283 5 8 0 1 0 0 mm 1 0 0 300 In any case provide at least 300 mm of free space below the unit Additionally make sure the...

Страница 5: ...o gather the drain water The drain pan kit consists of a b a Drain pan b U beams 283 mm 5 8 0 m m 3 2 3 To install the outdoor unit CAUTION Do NOT remove the protective cardboard before the unit is in...

Страница 6: ...corrosion of flared joints soap water may contain ammonia which causes a corrosive effect between the brass flare nut and the copper flare 1 Charge the system with nitrogen gas up to a gauge pressure...

Страница 7: ...d d Total refrigerant charge e Greenhouse gas emissions of the total refrigerant charge expressed as tonnes CO2 equivalent f GWP Global warming potential NOTICE In Europe the greenhouse gas emissions...

Страница 8: ...280 Sundhoffen Tel 33 0 3 89 21 74 70 Fax 33 0 3 89 21 74 74 e ma il in fo rote x fr www ro tex fr DAIKIN AIRCONDITIONING BELGIUM NV A v e n u e F r a n k l i n 1 B B 1 3 0 0 W a v r e Tel 32 0 10 23...

Отзывы: