background image

6

Fig. 11

6. Concrete and Anchoring:  

Run nut down just

below impact section

of bolt.  Drive anchor

into hole until nut and washer 

contact base.

Clean hole.

Drill holes using 5/8” car-

bide tipped masonry drill 

bit per ANSI B212.15-1994 

(R2000)

Tighten nut with

Torque wrench to 

60 ft.-lbs

.

    

CONCRETE AND ANCHORING REQUIREMENTS

STANDARD

ANSI/ALI ALCTV

IBC 2006, 2009, 2012

SEISMIC

Minimum Floor Thick-

ness

4-1/4 INCHES

4-3/8 INCHES

5 INCHES

Varies by location consult

with your structural engineer 

and manufacturer’s repre-

sentative.

Anchor

Hilti  Kwik  Bolt  III*        

5/8" x 4-1/4"

Hilti HIT-HY 

150MAX-SD 

Adhesive; Hilti 

HIT-HY 150 MAX 

Adhesive; HILTI 

HIT-RE 500-SD 

Adhesive

Hilti  Kwik  Bolt  III        

5/8" x 6"

Minimum Concrete 

Strength

3000 PSI

3000 PSI

3000 PSI

Minimum Anchor Em-

bedment

2-3/4 INCHES

3-1/8 INCHES

3-1/8 INCHES

Minimum Distance to 

Concrete Edge, Crack, 

Expansion Joint, Aban-

danoned Anchor Hole

4-1/2 INCHES

3-1/8 INCHES

2-1/4 INCHES

*The supplied concrete fasteners meet the criteria of the American National Standard 

“Automotive Lifts - Safety Requirements for Construction, Testing, and Validation” ANSI/ALI ALCTV-2011, and the lift 

owner is responsible for all charges related to any additional anchoring requirements as specified by local codes. 

Contact customer service for further information at: 800.445.5438

 

    

Содержание RFL25

Страница 1: ... I N S T A L L A T I O N I N S T R U C T I O N S SM30 RFL25 SM30 Capacity 30 000 lbs 15 000 lbs per axle 140 Minimum Wheelbase RFL25 Capacity 25 000 lbs 12 500 lbs per axle July 2018 by Vehicle Service Group CO10598 0 IN20490 Rev J 7 24 2018 LP20460 ...

Страница 2: ...uirements In the following section the terms highest and lowest refer to elevation of floor A Mark locations where lift columns will be positioned in bay B Place target at column positions and record readings Fig 2 C Find the highest of the four 4 locations Find the difference between the reading at each of the remaining three 3 columns and the highest reading D The difference is the estimated amo...

Страница 3: ...package including longer anchor bolts 4 Runway and Yoke Assembly A Determine direction of approach in bay B Position left runway in bay with hydraulic cylinder hose connection to rear of bay Cables and sheaves are pre assembled in runway Runway needs to be up off floor so shipping restraints can be removed from cable ends air and hydraulic lines and cylinder rod Pull cables air and fluid lines out...

Страница 4: ...acer As Shown To Maintain 5 16 Of Gap From End Of Yoke To Front Of Latch Bar Be Sure To Remove Spacer After Installation 1 2 Ears Of Spacer Tee Left Runway Right Runway Air Line in Runway Air Line To Lift Tee Tee Alignment Stud 5 16 REF Between Yoke End and Latch Bar Yoke Assembly Alignment Stud Latch Bar Column IMPORTANT The yoke column alignment studs MUST be used for proper centering of columns...

Страница 5: ...Double Return Bend always to the Inside of Lift RFL25 177 1 8 Ref SM30S 249 1 8 Ref SM30L 285 1 8 Ref SM30E L 321 1 8 Ref 133 1 4 Ref Check Lift Dimensions Width and length measurements are made from column sides NOT column base plate Diagonals are measured from inside corner of column 1 4 Tapping Screw Column Stop Plastic Slider Plastic Slider Fig 10 ...

Страница 6: ...I 5 8 x 4 1 4 Hilti HIT HY 150MAX SD Adhesive Hilti HIT HY 150 MAX Adhesive HILTI HIT RE 500 SD Adhesive Hilti Kwik Bolt III 5 8 x 6 Minimum Concrete Strength 3000 PSI 3000 PSI 3000 PSI Minimum Anchor Em bedment 2 3 4 INCHES 3 1 8 INCHES 3 1 8 INCHES Minimum Distance to Concrete Edge Crack Expansion Joint Aban danoned Anchor Hole 4 1 2 INCHES 3 1 8 INCHES 2 1 4 INCHES The supplied concrete fastene...

Страница 7: ...ol Maximum shim thickness is 2 Fig 12 If more shimming is required consult factory for different shim package including longer anchor bolts Drill four 5 8 diameter holes through concrete floor using base holes as guide Fig 11 Repeat for other columns D Insert base anchors Fig 11 Repeat for other columns Tighten nuts Recheck columns for plumb Re shim if necessary Torque anchor bolts to 60 ft lbs Fi...

Страница 8: ...ch using two 2 of the 5 16 18NC x 1 1 2 HHCS Fig 16 C Mount power unit with motor up to the column bracket and install four 5 16 lock washers and nuts D Run hydraulic hose from runway through slot in side of runway to power unit output port Fig 17 DO NOT use Teflon tape on hydraulic hose connections Install and hand tighten elbow to pump until O ring is seated and elbow should be oriented downward...

Страница 9: ...Unit Hose CAPACITY 30 000 LBS CAPACIT Y 30 000 LBS Fill Breather Cap Fig 16 Fig 17 Place air valve bracket on column bracket before attaching motor Push nuts hold bolts to brackets Use 4 5 16 18NC X 1 1 2 lg HHCS and Nuts On one bolt place 2 5 16 Star Washers PUSH TO RELEASE LATCHES NP280 PUSH TO RELEASE LATCHES NP28 0 ...

Страница 10: ...amp 3 phase 460v 8 75 amp Fig 18 and Fig 21 Wiring must comply with local electrical codes Note Motor CAN NOT be run on 50Hz line without a physical change in the motor WARNING Risk of explosion This equipment has internal arcing or sparking parts which should not be exposed to flammable vapors It should not be located in a recessed area or below floor level NEED ASSISTANCE CALL 1 800 445 5438 OUR...

Страница 11: ... 1 4 Flat Washers and 4 1 4 Star Washers Fig 20 B Route cord through strain relief on motor and connect per table on top of page T1 T2 T3 U2 V2 W2 W1 V1 U1 575V 60 Hz 3Ø Three Phase Power Unit MOTOR OPERATING DATA TABLE THREE PHASE LINE VOLTAGE RUNNING MOTOR VOLTAGE RANGE 208 240V 50 60Hz 197 253V 400V 50Hz 360 440V 440 480V 50 60Hz 396V 528V 575V 60Hz 518V 632V L1 L2 L3 L1 L2 L3 208 240V 50 60Hz ...

Страница 12: ... 3 4 or it will leak B Use Housing Collar to secure the Air Valve to the Air Valve Bracket Fig 24 C Attach enclosed NP280 decal PUSH TO RELEASE LATCHES below button on air valve bracket Fig 16 D Run 1 4 air line from air valve to the slot in the fixed runway Cut airline to length required and attach to Tee in runway Fig 22 E Connect Reducing Tee to female connector Fig 24 using 3 8 air line tubing...

Страница 13: ... for the first front latch to click into place Adjust this simultaneously with the rear columns E Do the same for the remaining front column F Tighten jam nuts and lower lift Note Latches may not click in at the same time when vehicle is being raised They should be closed Be sure all four 4 corners have passed the locking latch bar slot before lowering lift on locking latches Note Replace any miss...

Страница 14: ...NOTES ...

Страница 15: ...NOTES ...

Страница 16: ...ve to lift owner operator Thank You Trained Operators and Regular Maintenance Ensures Satisfactory Performance of Your Rotary Lift Contact Your Nearest Authorized Rotary Parts Distributor for Genuine Rotary Replacement Parts See Literature Package for Parts Breakdown ...

Отзывы: