Ross CrossOver 6 Скачать руководство пользователя страница 8

 

Set Up for Installing the hyperSTATION Upgrade

 

1-2

 

 

 

hyperSTATION Upgrade Installation Guide

 

Tools Needed to Perform the Upgrade

 

Locate the following tools and have them ready before you begin the upgrade procedure:

Phillips screwdriver (size #1)

Phillips screwdriver (size #2)

Flat Head Screwdriver

Anti-static wrist strap (provided with Upgrade kit)

An anti-static mat is also useful. If none is available, use the anti-static packaging 
provided with the hyperSTATION Upgrade kit.

 

Precautions and Safety Information

 

This section provides information intended to minimize the risk of damage to the 
computer and to the upgrade kit components. Please read this section carefully before you 
begin the upgrade procedure.

 

Component Handling Precautions

 

Follow these precautions when you handle the motherboard and other internal components 
during the upgrade procedure:

Make sure the power switch on the back panel of the computer is set to the off position 
before you open the computer.

 

Important:

 

 Be sure that the power cable for the computer is 

 

unplugged

 

 from the 

computer power socket on the back of the computer. Damage may occur to the 
hyperSTATION motherboard if the power cable is connected to the computer during 
the motherboard installation.

Use the disposable wrist strap provided with the upgrade kit to ensure proper 
grounding during the installation procedure.

Touch the metal casing of the computer’s power supply to discharge any static 
electricity that may have accumulated on you.

Leave the motherboard, CPU module(s) and memory SIMMs (if any) in their 
protective packaging until you are ready to install them.

Handle the motherboard by the back panel. If you must touch the circuit board, handle 
it by the edges.

Handle the ROSS hyperSPARC modules and memory SIMMs by the edges. Do not 
touch the connectors.

During installation, never force components into their slots. Excessive force can 

Wrist strap

Содержание CrossOver 6

Страница 1: ...Installation Guide for model 6 model 30 hyperSTATION Upgrade Motherboard PN 830 0002 01 Rev G ...

Страница 2: ... A 1 512 436 2800 All rights reserved This product and related documentation is protected by copyright and distributed under licenses restricting its use copying distribution and decompilation No part of this product or related documentation may be reproduced in any form by any means without prior written authorization of ROSS Microcomputer Corporation and its licensors if any Portions of this pro...

Страница 3: ...ions 1 2 Recording NVRAM Configuration Parameters 1 3 Customer Support Information 1 3 Unpacking the Upgrade Kit 1 3 Chapter 2 Installing the hyperSTATION Upgrade 2 1 Task 1 Shut down the system 2 1 Task 2 Open the computer 2 2 Task 3 Remove the SPARCstation motherboard 2 3 Task 4 Install the hyperSTATION motherboard 2 5 Task 5 Install the ROSS hyperSPARC module s 2 7 Task 6 Install the memory SIM...

Страница 4: ...hyperSTATION Upgrade Installation Guide iv ...

Страница 5: ... 3_U1 CD and instruction sheet Disposable wrist grounding strap Warranty information Product Registration card Upgrade Rebate Certificate Replacement Plastic Feet Audio Cable 3 5mm Stereo to 3 5mm Stereo Packing List The number of ROSS hyperSPARC MBus modules and memory SIMMs included in your Upgrade kit depends on the kit you purchased The Packing List describes the exact number of hyperSPARC mod...

Страница 6: ...vi hyperSTATION Upgrade Installation Guide ...

Страница 7: ...ade Important If you are running SunOS 4 1 3 or 4 1 3_U1 carefully follow the attached instructions for installing the Ross Technology hyperSPARC kernel patch CD for Solaris 4 1 3 and 4 1 3_U1 You must do this before starting the hyperSTATION upgrade If you ever need to re install your 4 1 3 or 4 1 3_U1 system software after performing this hyperSTATION upgrade call ROSS Microcomputer Corporation ...

Страница 8: ...rocedure Make sure the power switch on the back panel of the computer is set to the off position before you open the computer Important Be sure that the power cable for the computer is unplugged from the computer power socket on the back of the computer Damage may occur to the hyperSTATION motherboard if the power cable is connected to the computer during the motherboard installation Use the dispo...

Страница 9: ...twork or local printer Customer Support Information If you encounter problems during installation contact ROSS Microcomputer Technical Support at 1 888 RMCC NOW 1 888 762 2669 Unpacking the Upgrade Kit The hyperSTATION motherboard is packaged in an anti static bag and placed in a protective foam casing To remove the motherboard from the packaging open the box and lift the top piece of foam The hyp...

Страница 10: ...Set Up for Installing the hyperSTATION Upgrade 1 4 hyperSTATION Upgrade Installation Guide ...

Страница 11: ...se and installing the motherboard are nearly identical for all SPARCstations Please refer to the manual provided with your computer for specific information about your SPARCstation Important Before you begin be sure to Read the precautionary statements in Chapter 1 Have all tools needed to perform the upgrade installation at hand see Chapter 1 Install the ROSS Technology SunOS 4 1 3 4 1 3_U1 Kerne...

Страница 12: ...cable from the connector on the back panel of the computer 9 Disconnect all other peripheral device cables from their connectors on the computer Important Unplug the power cable from the computer before you proceed Serious damage could occur to the motherboard if you do not unplug the power cable prior to doing the motherboard installation Task 2 Open the computer To remove the cover from the comp...

Страница 13: ...erSTATION Upgrade Kit to provide grounding for static electricity Wrap the wrist strap around your wrist twice The adhesive side of the tape should be against your skin Attach the end of the wrist strap with the adhesive copper strip to the metal casing of the power supply in the computer 2 Remove any SBus cards from the computer motherboard Use a screwdriver to remove any screws for the SBus card...

Страница 14: ...perSTATION motherboard SBUS graphics options must be used 3 Disconnect the following cables from their connectors on the motherboard Floppy drive cable Optional CD ROM audio cable on SPARCstation 5 only Internal SCSI cable Hard disk CDROM Power supply cable LED speaker cable The number type and location of these connectors vary depending on the system you have Please refer to the hardware manual p...

Страница 15: ... Microcomputer Corporation as well Task 4 Install the hyperSTATION motherboard Important The hyperSTATION motherboard is designed to fit into any standard Sun SPARCstation 5 or SPARCstation 20 chassis If your computer has a nonstandard chassis you must replace two plastic feet on the underside of the motherboard before you install the motherboard in the computer The hyperSTATION Upgrade kit includ...

Страница 16: ...he hyperSTATION Upgrade kit 6 Connect the following cables to their new connectors on the hyperSTATION motherboard Floppy Drive cable If Present SCSI device cable Power supply cable LED speaker cable The number and type of cables you need to connect may vary depending on your SPARCstation configuration Refer to the hardware manual provided with your SPARCstation for details Note Some SPARCstation ...

Страница 17: ...omputer The SBus card connector if present should appear in the opening on the back panel Note AFX Bus cards must be removed from SPARCstation 5 computers where fitted and cannot be reused with the new hyperSTATION motherboard SBUS graphics options must be used Position the SBus card connector over the receiving connector on the motherboard then firmly but carefully push the connector on the card ...

Страница 18: ...dule installed or the system will not work If you have only one MBus module it must be installed in slot 0 4 Insert the back edge of the MBus module between the lower and upper metal tabs located on the back panel of the hyperSTATION Motherboard Position the MBus module connector over the receiving connector on the motherboard If you have a single MBus module it must be installed in slot 0 the low...

Страница 19: ...tall the memory SIMMs 1 Be sure the disposable grounding strap is attached to your wrist and to the power supply casing 2 Remove the SIMMs from their anti static packaging and place them on a clean anti static surface Notice that the SIMMs are keyed a notch appears on one end of the SIMM at the bottom next to the connector If you are facing the computer with the back panel nearest to you the notch...

Страница 20: ... panel The computer begins power on routines and runs self tests Once the self tests are completed and functional modules are recognized the operating system configures itself automatically to take advantage of all available processors The boot information that displays on the screen should confirm that all MBus hyperSPARC modules are recognized Information appears for mod0 mod1 mod2 and so on Thi...

Страница 21: ... upgrade These numbers are hard coded on to each motherboard and hence changed as a result of the motherboard upgrade Note If system takes a long time to BOOT the POST Power On Self Test must be set to the on position This setting causes the system to perform diagnostic tests before booting the operating system To disable POST use the following instuctions 1 Halt the system with the HALT command 2...

Страница 22: ...Installing the hyperSTATION Upgrade 2 12 hyperSTATION Upgrade Installation Guide ...

Страница 23: ...utlet on a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help In case of TV or radio interference turn the antenna until the interference stops or consider installing an antenna with coaxial cable lead in between the antenna and the TV Increase the separation between the equipment and receiver Reorient or relocate the re...

Страница 24: ...Agency and Regulatory Statements 3 2 hyperSTATION Upgrade Installation Guide ...

Отзывы: