Reference Manual
00809-0100-4792, Rev CA
August 2010
A-9
Rosemount 1495, 1496
Schedule 30
★
FF
Schedule 40
★
FG
Schedule 40S
★
FH
Schedule Standard (STD)
★
FI
Schedule 60
★
Schedule 80
★
Schedule 80S
★
FL
Schedule Extra Strong (XS)
★
Schedule 100
★
FN
Schedule 120
★
Schedule 140
★
FQ
Schedule 160
★
FR
Schedule Double Extra Strong (XXS)
★
Special Cleaning
Expanded
P2
Cleaning for special processes
Special Inspection
Standard
Standard
QC1
Visual and dimensional inspection with certificate
★
QC7
Inspection and performance certificate
★
Material Traceability Certification
Standard
Standard
Q8
Material certificate per ISO 10474 3.1.B and EN 10204 3.1.B
★
Code Conformance
Expanded
J5
(8)
NACE MR-0175 / ISO 15156
Country Certification
Expanded
J1
Canadian Registration
Typical Model Number: 1495 PC 040 A3 S A 02125
(1) Available in line sizes from 2-12 inches.
(2) Previously PN64.
(3) Standard Plate Thickness:
DN50 - 65 = 3 mm
DN80 – 450 = 4 mm
DN500 - 600 = 6 mm
(4) This option requires pipe I.D. to be specified. Please select alternate pipe schedule option or specify on order.
(5) Integral Plate Holder (material matches plate material) for line sizes to 3-in., requires minimum
1
/
4
-in plate thickness. Screw Type Plate Holder in 304SS
for line sizes 4-in. and larger.
(6) A standard beveled orifice plate is provided with the “RO” option code.
(7) These options should only be selected if options DV, TE, or TS are selected. These options are not available with flange rating D1-D6.
(8) Materials of Construction comply with metallurgical requirements highlighted within NACE MR0175/ISO 15156 for sour oil field production environments.
Environmental limits apply to certain materials. Consult latest standard for details. Selected materials also conform to NACE MR0103 for sour refining
environments.
Table A-3. Rosemount 1495 Orifice Plate Ordering Information
★
The Standard offering represents the most common options. The starred options (
★
) should be selected for best delivery.
__
The Expanded offering is subject to additional delivery lead time.
Содержание 1495
Страница 2: ......
Страница 4: ......
Страница 12: ...Reference Manual 00809 0100 4792 Rev CA August 2010 Rosemount 1495 1496 2 4 ...
Страница 52: ...Reference Manual 00809 0100 4792 Rev CA August 2010 Rosemount 1495 1496 A 14 ...
Страница 66: ...Reference Manual 00809 0100 4792 Rev CA August 2010 Rosemount 1495 1496 B 14 ...
Страница 68: ...Reference Manual 00809 0100 4792 Rev CA August 2010 Rosemount 1495 1496 C 2 NOTES ...
Страница 69: ......