background image

Tasting Niche 750ml Indiv.

1

Fasteners

 

 

 finishing nails to 

fasten cross pieces 

 

 brad nails if using 

pneumatic brad nailer 

 

 screws to attach 

to other modules 

 

 screws for attaching 

racks to wall 

 

1

4

1

1

4

1

1

4

#8x1

#8x3

 

Tips:

 

1.

 

Using pneumatic brad nailer will make assembly 

quicker and easier. 

 

2.

 

Before opening any boxes, if multiple units and 

different units have been ordered, please assemble 

all boxes by units to ensure that specific unit parts 

are not intermixed with other units. 

 

3.

 

It is highly recommended to drill 

 dia pilot 

holes on back cross pieces for 

 screws 

before attaching to wall. 

3

32

#8x3

Assembly Instructions -6Ft- 

 

Tools Needed:

 

 

Hammer 

 

Pneumatic Brad Nailer 

 

Power drill 

 

Level 

 

Power miter saw (Preferred) 

 

 pilot drill 

 

Nail Set 

 

Wood filler (Optional) 

 

180 grit sand paper (Optional) 

 

3

32

(Preferred)

Apr/23/2012

Toll Free: 1-888-253-6807 

www.RosehillWineCellars.com

6ft Premier Cru

Kit Rack

Содержание Premier Cru Tasting Niche CRU6 TN750ML8COL

Страница 1: ...rent units have been ordered please assemble all boxes by units to ensure that specific unit parts are not intermixed with other units 3 It is highly recommended to drill dia pilot holes on back cross pieces for screws before attaching to wall 3 32 8x3 Assembly Instructions 6Ft Tools Needed Hammer Pneumatic Brad Nailer Power drill Level Power miter saw Preferred pilot drill Nail Set Wood filler Op...

Страница 2: ...ss piece 2 pcs Cross piece 4 pcs Cross piece 1pc Left end ladder 3 4 72 1pc Left custom ladder 3 4 72 1pc Right custom ladder 3 4 72 5pcs Middle ladder 1 2 9 5pcs Middle ladder 13 16 36 1pc Right end ladder 3 4 72 Apr 23 2012 Toll Free 1 888 253 6807 www RosehillWineCellars com 6ft Premier Cru Kit Rack ...

Страница 3: ...p piece flush with top of the ladders Step 2 Attaching middle ladders Take the middle ladders making sure the angled cleats are facing front Place each ladder into cross piece slots and nail from the back on all five back cross pieces Top of Rack 1st Cleat 5th Cleat 9th Cleat 10th Cleat First cleat is located from the bottom of the ladder 1 4 3 Angled cleats facing front Apr 23 2012 Toll Free 1 88...

Страница 4: ... top Nail the cross pieces on the bottom of middle ladders Fasten optional stemware holder under middle ladders to the cross pieces from the top using 8x1 screws Fasten counter top to the spacers from the bottom using 8x1 screws It is highly recommended to drill dia pilot holes in cross pieces and spacers before attaching glass holder and counter top 1 4 1 4 3 32 Face this top cross piece upwards ...

Страница 5: ...before screwing to wall For a professional looking job you can use a nail set to indent the nail heads and wood filler to fill in the nail holes on the front cleats baseboard and crown moulding Give the part that was filled a light sanding with 180 grit sandpaper 3 32 baseboard attached to bottom of rack 1 4 3 Crown moulding attached to top of rack 1 2 1 Apr 23 2012 Toll Free 1 888 253 6807 www Ro...

Отзывы: