Roper Rhodes PLATEAU AS515ALIL Скачать руководство пользователя страница 2

PLATEAU & SUMMIT CABINET

 - 

AS515ALIL, AS615ALIL

LED CABINET PRODUCT INSTRUCTIONS

INSTALLATION PROCEDURE

Before commencing installation switch off electrical 
supply at the mains. 

The wall surface must be of suitable strength and 
construction.

1.  Remove the cabinet from the packaging taking special 
care with the mirrored doors and glass shelves
2.  Using a pencil, mark on the wall where you wish the 
centre of the top surface of the cabinet to be (2.1).
3.  Measure 60mm vertically below this point and make a 
mark. (3.1)
4.  Using a spirit level, draw a line of distance X centred 
on this point and parallel with the floor.
5.  Align the outer edge of the wall brackets with the ends 
of this line (5.1 & 5.2)
6.  Using the wall brackets as a guide, accurately mark 
the hole positions.
7.  Drill the marked holes and fit the wall plugs.
NOTE: The wall plugs supplied are only suitable for solid 
stone / brick walls. For plasterboard walls use specialist 
wall plugs.
8.  Screw the wall brackets into place ensuring the screws 
are fully tightened but take care not to overtighten.
9.  Hang the cabinet on the wall brackets and check its 
level (finer adjustments can be made by opening the 
cabinet’s top electrical compartment and turning screw A 
on each individual hanger until level).
10.  When the cabinet is level mark the hole on the lower 
section of the cabinet backboard (10.1). Take the cabinet 
off the wall.
11.  Drill and fit the wall plug into the lower section 
backboard hole just marked.
12.  Before making any electrical connections (or 
performing any maintenance) turn off the mains electricity 
supply.
13.  Using the connection wire found on the rear of the 
cabinet, make the necessary connections in accordance 
with the current IEE regulations. A second person will 
need to hold the cabinet in place whilst electrical 
connections are made.
14.  Hang the cabinet on the wall brackets and tighten 
screw B within the electrical compartment. This will pull 
the cabinet closer to the wall.
15.  After all cabinet hanger adjustments are complete, 
close electrical compartment.
16.  Screw in the internal securing screw (16.1).
17.  Once the installation has been completed, restore the 
mains power and test the functions of the cabinet.

Roper Rhodes Ltd, Brassmill Lane Trading Estate, Bath, BA1 3JF

Tel:01225 303 900 | Email: [email protected]

www.roperrhodes.co.uk

Strip wires to a suitable
length. DO NOT connect
to a plug & socket outlet.

THIS PRODUCT IS MANUFACTURED TO CLASS I

CATEGORY AND MUST HAVE AN EARTH CONNECTION.

! IF IN DOUBT CONSULT YOUR ELECTRICIAN !

COLOUR CODING:

L  -  Live 

= Brown

N  -  Neutral  = Blue
 

-  Earth  = Green & Yellow

OPERATING INSTRUCTIONS

The cabinet comes with LED lighting, which is controlled via an IR sensor. 

Turn cabinet 

ON/OFF

To turn the cabinet on/off, slowly wave your hand in front of the IR sensor. 

Measure this distance for position

of ends of wall brackets

WALL MOUNTING

A

B

Internal securing

screw (step 16)

(x)

(2.1)

(3.1)

Top of cabinet

60mm

Centre Line

x

(5.1)

(5.2)

(16.1)

(10.1)

(2.1)

Centre Line

HINGE ADJUSTMENT

C

C

D

D

To make door depth adjustments,
turn screw C.

To make horizontal door adjustments,
turn screw D.

C

D

Note:

 

Cabinet for illustrative purposes. 

Please match your components to the 
relevant diagram

Отзывы: