ROOF MAKER SLIMLINE LANTERN Скачать руководство пользователя страница 17

Call us: 0116 269 6297 

Mon-Fri 9-5pm 

STEP 

5

Now the lantern is installed, you can create the groove/s required in the timber 
reveals, to house the vent actuator cabling. Mark a line down the timber reveal, 
vertically level with 

the grommet’s position.  Use the line as a guide  to notch a 

groove  into the timber 

structure. This will house the cabling when it is fed 

through the upstand, and allow it to run into the property. Ensure the groove is 
deep enough to expose the hole you have prepared in the bottom of the upstand 
and house the cable sufficiently, so it will not obstruct the plasterboard when 
applied to the reveals later on.

STEP 

6

You can now run the cable that comes from the vent actuator through the hole 
in the upstand frame above the blind trim, out through the bottom of the unit 
and into the groove you have formed in the reveal. You will need to extend the 
cable to the chosen location of your rocker switch/climate control panel. Once 
the vent has been fully wired in and checked, the installer can then proceed to 
plaster the inside reveals, as per the finishing  guidelines shown in the 
installation guide. 

Be sure to instruct the installer not to put plasterboard fixings 

where the cabling is located in the reveal.

Vertically level 
with grommet

Mark and form a 
channel in timber reveal 
below roof lantern. This 
will expose the 
grommet on 

the 

underside of the 
lantern.

Feed the motor 
cable through 
the grommet 
above the blind 
trim

Push cable through the 
frame so it comes out of the 
grommet on the underside 
of the unit and into the 
channel you have formed in 
the reveal

CABLE LOCATION GUIDE 

SLIMLINE

®  

ROOF LANTERNS WITH ELECTRONIC VENTS AND  BLACKOUT BLINDS

Page 

1

6

 

of 1

6

 

Содержание SLIMLINE LANTERN

Страница 1: ...PRODUCT SPECIFCATION INSTALLATION GUIDE FULLY ASSEMBLED SLIMLINE LANTERN ...

Страница 2: ... thermal insulation Polyamide thermal breaks Integrated drip lip Screw recess to allow for easy fixing to roof structure Structurally bonded silicone Spacer bar system warm edge no metalic tri seal super spacer desiccant impregnated Argon Gas Toughened to BS EN 12150 Manufactured to BS EN 1279 Part 2 3 Standard Energy Glass unit shown above DOUBLE GLAZED SLIMLINE LANTERN STANDARD PRODUCT SPECIFICA...

Страница 3: ...ghened safety high spec low E centre panel 4mm Reflex toughened safety high spec low E inner panel Structurally bonded silicone Plastic packer Marine grade Durable powder coated kerb Platinum thermal insulation Polyamide thermal breaks Toughened to BS EN 12150 Manufactured to BS EN 1279 Part 2 3 Standard Energy Glass unit shown above n Gas 6m m Krypton Gas 6m m Krypto TRIPLE GLAZED SLIMLINE LANTER...

Страница 4: ... will require can be found on pages 12 16 ON DELIVERY YOU WILL RECEIVE Your fully assembled Slimline Roof Lantern If you have a manual opening vent you will also receive a chrome winding pole If you have a rocker switch controlled vent you will also receive a rocker switch If you have a vent with climate control and rain sensor you will also receive the wall mounted control unit and rain sensor IN...

Страница 5: ...ly from corner to corner before PREPARE THE ROOF MEMBRANE We recommend that you apply your roof membrane after installing your roof lantern to avoid damaging or piercing it during the installation If you have added your roof membrane on top of your plywood deck already please ensure that you leave enough excess material around the timber kerb to flash the roof lantern upstand This can be folded bac...

Страница 6: ...side For larger lanterns we recommend inserting additional screws at approx 500mm intervals Now that your lantern is fixed to the timber kerb you need to flash it in which acts as the final stage of weatherproofing Purpose made groove here to screw fix the upstand section to your timber kerb STEP 4 SCREW FIX THE LANTERN TO THE TIMBER KERB You now need to secure the upstand to the timber kerb by ins...

Страница 7: ...vent you from damaging the unit by applying heat directly FLASHING GUIDELINES GRP membrane If using GRP to finish the roof you should silicone bond a 4mm plywood border around the upstand and kerb Screw fix this into the timber kerb if you wish to make it more secure This will provide a more suitable surface for the GRP to adhere to Ensure that this goes right up underneath the drip lip as the bel...

Страница 8: ...Silicone bead to be applied all the way around your upstand preferably nearer the inside edge before lowering your rooflight into place Black out blind option When blinds are selected plaster up to blind trim IF INCLUDING BLACKOUT BLINDS Pre drill frame and screw fix through purpose made recess as per your step by step fitting guide Plasterboard Stop bead Roof membrane tucked and sealed under dedi...

Страница 9: ...switch that springs back to the central off position 230V 0 1 2 3 Rocker switch wiring diagram 3 Core Single motor Colour Number Signal Brown 1 Opens Black 2 Closes Grey 3 Common TEC 001 Rev001 Updated By Sabahudin Medic Issued Dec 2015 3 CORE SINGLE MOTOR 230V 0 1 2 3 na ens mmo Rocker switch wiring diagram 3 Core Multiple motors TEC 001 Rev001 Updated By Sabahudin Medic Issued Dec 2015 Colour Nu...

Страница 10: ...ing examples for both a single vent or when 2 vents have been included Please note We provide a white plastic rocker switch when you have opted for a rocker switch controlled rooflight If you would like to replace this for something that matches the remaining switches you have in the property please ensure that it is a 2 way and off retractive switch that springs back to the central off position C...

Страница 11: ...www vent co uk Unit 16c 16f Chalwyn Industrial Estate Poole Dorset BH12 4PE To enter advanced setup set your unit to AUTO mode then press and hold the AUTO MAN plus SET buttons simultaneously for 5 seconds Your screen should now read ADV SETUP After a moment the screen will change to display To Advance Press SET Using SET is how you scroll through the available options and saves each stage of any ...

Страница 12: ...0 series operate A The 100 series has a 5 amp capacity Frequently Asked Questions We have compiled the following list of Frequently Asked Questions to assist you with any troubles you may encounter We advise a difference of at least 2o between the opening and closing temperature 3 4 5 6 fig fig fig fig fig fig fig fig fig fig fig fig 2 core screened cable External TempSensor Optional Q Where do I ...

Страница 13: ...oned and fixed to your timber kerb It is also necessary to notch a small groove into the inside internal face of your kerb and reveal This will allow the actuator cable to run into the property where it comes out of the underside of the lantern s built in upstand These grooves however can be created when the lantern is properly positioned and fixed onto the timber kerb outlined in the guide Tools ...

Страница 14: ...ll need to place the lantern onto trestles which will allow you to safely get to the underside and inside face of the lantern upstand where the vent is positioned We recommend that you use trestles that will give you at least 1000mm clearance below the rooflight Ensure that the supporting trestles are strong and steady enough for the weight of the lantern you have STEP 1 Where the vent is position...

Страница 15: ...ll bit to drill a hole Take your time and ensure that the hole is only made in this surface and doesn t go through any deeper Tip you can place masking tape onto the frame where the hole needs to be drilled which will stop the drill slipping and also prevent the powder coating from chipping in this area 15mm down from top edge of aluminium profile Ensure that you only go through first layer of met...

Страница 16: ...can also use the masking tape here to prevent the drill slipping as mentioned in the previous step You will be drilling into the first chamber again as shown In line with the first hole you drilled STEP 4 Place the rubber grommets into both holes you have just drilled If you have two vents repeat this process on the opposite side of the roof lantern following the same instructions The upstand sect...

Страница 17: ...the blind trim out through the bottom of the unit and into the groove you have formed in the reveal You will need to extend the cable to the chosen location of your rocker switch climate control panel Once the vent has been fully wired in and checked the installer can then proceed to plaster the inside reveals as per the finishing guidelines shown in the installation guide Be sure to instruct the ...

Отзывы: