![Ronstan BB Orbit Block RF25109 20 Series Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/ronstan/bb-orbit-block-rf25109-20-series/bb-orbit-block-rf25109-20-series_user-instructions_1485263002.webp)
1.0 LASHING OPTIONS
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
Pass the line down through the
head and out through the cheek.
Pass line through the hub.
Pass line in through the
opposite cheek and back up
through the head.
Finish lashing with appropriate
knot, splice or whipping.
Pass line around fixing point.
Repeat steps 1.1.1 to 1.1.3
if more than one lashing is
required to meet desired
breaking load.
1.1 Attachment at 0° (in-line)
1.1
Attachment at 0°
1.2
Attachment at 90°
1.3
Line end attachment
Large diameter
object attachment
(Must have at least 2 strands)
1.4
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
Pass the line down through the
head, out through the cheek and
through the hub.
Pass line in through the
opposite cheek and back up
through the head.
Loop line over the fixing point.
Pass back down through the
head and out the same cheek it
last passed through.
Finish lashing with appropriate
knot, splice or whipping.
Pass line through the hub, in
through opposite cheek and up
through the head. Repeat steps
1.2.1 to 1.2.3 if more than one
lashing is required.
1.2 Attachment at 90° (transverse)