background image

ROMAC

INDUSTRIES,

INC.

INSTALLATION INSTRUCTIONS

21919 20th Avenue SE • Suite 100 • Bothell, WA 98021 • Phone (425) 951-6200 • 1-800-426-9341 • Fax (425) 951-6201

PRECAUTIONS

1. 

  Check diameter of pipe to make sure you are using the correct size clamp; also check gasket to make 

sure it is the size you think it is.

2.

  Clean pipe to remove as much dirt and corrosion as possible from pipe surface and bell face where the 

gasket will contact. Lubricate gasket and pipe with soapy water or approved pipe lubricant per ANSI/

AWWA C111/A21.11.

3.

  Make sure no foreign materials lodge between gasket and pipe.

4.

  Avoid loose fitting wrenches, or wrenches too short to achieve proper torque.

5.

  Keep threads free of foreign material to allow proper tightening.

6.

  Take extra care to follow proper bolt tightening procedures and torque recommendations. Bolts are often 

not tightened enough when a torque wrench is not used. 

7.

  The thick edge of the gasket should be facing the bell face.

8.

  The puzzle joint of the gasket should be between casting joints.

9.

  Pressure test for leaks before backfilling.

10.

  Backfill and compact carefully around pipe and fitting.

11.

  When reinstalling parts with stainless steel hardware there may be a loss in pressure holding ability due 

to worn or damaged threads during the original installation.

COMMON INSTALLATION PROBLEMS

1.

  Bolts are not tightened to the proper torque.

2.

  Rocks or debris between pipe and gasket.

3. 

  Dirt on threads of bolts or nuts.

4.

  Puzzle joint in gasket not off set from casting joint.

5.

  Thick end of gasket not toward the bell face. 

6.

  Too much pipe deflection.

7.

  Using wrong gasket (a special gasket is required for 10" & 12" Class 200 pipe).

Style 517  

Bell Joint Leak Clamp

517 Bell Joint Leak Clamps for 10" & 12" Class 200 pipe require special gasket

Отзывы: