11
RolliBot RolliCool Mini-Split AC User Manual
Section 3. Setting Up the AC
3.1 – Installing the Indoor Unit
• Choose a mounting location situated next to a window as the Coolant Lines must be run through a window in order to
keep the Indoor and Outdoor Units connected.
• Using a stud detector for detection and installation into wall studs may be desired for more secure mounting.
Step 1.
Choose a suitable
location on the wall for
mounting the unit.
Step 4.
Use a drill to make 4 holes at each of the marks.
Step 5.
Insert the Wall Anchors into the wall.
Step 6.
Add the screws into their anchors making sure a length of
4mm~9mm is left out of the wall.
Step 7.
Install the Indoor Unit onto the wall making sure the
notches in the Mount Openings slide over the screws.
Step 8.
Check to ensure the Indoor Unit is securely installed on the
wall.
Step 9.
Remove the Indoor Unit for now to prepare for connection.
After installing the Outdoor Unit (Section 3.2) and Connecting
the Coupler (Section 3.3), reinstall the Indoor Unit on the wall.
Step 2.
Measure between the
Mount Openings on the back
of the unit.
Step 3.
Mark locations on
the wall according to the
openings.
H
L