X
Page 12
ZIPSCREEN EXTREME Installation Manual | SEP 2020
2020 © Copyright All Rights Reserved Rollease Acmeda
SIDE GUIDE INSTALLATION FOR BOTH BOX 190 & OPEN BRACKET
SECTION 2 - INSTALLATION
STEP 5 - SECURE STOPS BACK INTO FUNNEL
STEP 7 - SECURE INNER RAIL TO THE U MOUNTING RAIL
STEP 6 - RUN SHADE UP & DOWN TO ALLOW INNER RAIL TO MOVE INTO NATURAL POSITION
NOTE:
If there is inadequate access to the
back of the blind re-attach stops, add
only to the front of the blind on both
ends
NOTE:
The distance between the weight bar
end cap and the edge of the inner rail
should always be between 35mm –
55mm (0138” – 0217”)
The inner rails should sit parallel with
the zip to avoid strain or jamming of
the blind during operation Ensure the
zip is running inside the inner rail on
both sides
Nominal Inner Rail “x” dimension
BOX 190
52mm (2047”)
Open Bracket
49mm (1929”)
Screw/rivet Inner Rail at central
position
Содержание Zipscreen Extreme
Страница 1: ...ZIPSCREEN EXTREME INSTALLATION MANUAL...