4-72
This is required when Take-up unit is installed or TU Junction Board is replaced.
This is to check whether Take-up Unit operates properly.
1
Confirm that the cable is connected to the connector
named [TAKE UP] and turn on the Main Power switch.
2
SERVICE MENU
[ ] , [ ] , [ ] + SUB POWER ON
[MENU] key
MENU
[TU] menu supports the connector named
[TAKE UP].
Although [OPTION-TU] menu is for another
connector with no name, it is not in use.
3
Select [TU] menu under [SUB MENU]>[TU CHECK].
SERVICE MENU
SUB MENU
SUB MENU
TU CHECK
[ ]
[ ]
[ ]
[ ]
TU CHECK
TU
TU
START START
[ ]
Undersurface of the right side of machine
4-17 TAKE-UP UNIT OPERATION CHECK (Referential Time : 2min.)
Turn on the Sub Power switch while pressing [ ],
[ ] and [ ] keys to enter the SERVICE MODE.
Содержание SOLJET Pro III XC-540
Страница 5: ......
Страница 26: ...2 4 2 MAIN BOARD_Arrangement Diagram Soldering Side...
Страница 36: ...2 14 2 2 3 HEAD BOARD It indicates the version of the Head Board HEAD BOARD_Arrangement Diagram Component Side...
Страница 37: ...2 15 2 HEAD BOARD_Arrangement Diagram Soldering Side...
Страница 45: ...2 23 2 SERVO BOARD_Arrangement Diagram Soldering Side...
Страница 50: ...2 28 2 2 5 HEATER BOARD It indicates the version of the Board HEATER BOARD_Arrangement Diagram Component Side...
Страница 55: ...2 33 2 2 7 SUB BOARD It indicates the version of the Board SUB BOARD_Arrangement Diagram Component Side...
Страница 60: ...2 38 2 2 8 TAKEUP BOARD It indicates the version of the Board TAKEUP BOARD_Arrangement Diagram Component Side...
Страница 223: ...7 2 7 Unpacking...
Страница 224: ...7 3 7 Unpacking the Stand Shafts Stand Legs Stay Unpacking the Accessory Box Manual CD ROM etc Ink cartridge tray...