Rohl Perrin & Rowe U.3706X Скачать руководство пользователя страница 3

www.rohlhome.com

Tighten securing nut to under side of work surface.

Connect the side valves to the nozzle using the flexible hoses.

Assemble and connect pop-up waste.

Ensure all connections are firmly tightened.

Connect Hot & Cold water supplies to side valve inlets.

Remove pop-up from waste. Unscrew and remove top waste,
complete with foam seal, through waste hole in basin/bidget.
Offer bottom waste, complete with rubber seal, to underside of
basin/bidet and screw top waste into bottom waste. Ensure
that pop up shaft is in position alongside pop up rod. (Shaft
can be cut shorter if space is restricted). Slide fixed end of
clamp bracket onto pop up shaft. Lift pop up rod and then
lower into swivel end of clamp bracket. Adjust position of clamp
bracket to achieve maximum movement of pop up shaft. Place
pop up into waste and adjust movement using the screw in the
bottom of the pop up.

P R E P A R A T I O N

Flush the plumbing system before installing the mixer faucet.
This is to avoid plumbing residues clogging the aerated outlet,
or possibly damaging the ceramic valves. This is especially
important where extensive plumbing work has been carried out.

The Hot supply should be on the left when viewed from the
front of the fitting.

C H E C K L I S T

!!  

Temperature of the hot water supply does not exceed 185 F

!!

!!

R

Re

ecco

om

mm

me

en

nd

de

ed

d  

minimum water supply pressure - 30 psi 

!!

!!  

R

Re

ecco

om

mm

me

en

nd

de

ed

d  

maximum water supply pressure - 75 psi

!!

!!  

IId

de

ea

all  p

pe

errffo

orrm

ma

an

ncce

e  o

ob

btta

aiin

ne

ed

d  w

wiitth

h  e

eq

qu

ua

all  h

ho

ott  &

&  cco

olld

d  p

prre

es

ss

su

urre

es

s

!!

A S S E M B LY - Refer to Fig 1.

Assemble the nozzle by placing the hoses through the hole
in the worksurface en sur ing that the base ring & seal are in
place.

Place clamp plate and securing nut onto the clamp bolt, tighten
with spanner provided to underside of worksurface.

To assemble sidevalve, ensure the spacer ring, clamp plate
and securing nut are in place on the valve body, then from
the  underside of worksurface, push the valve body through
the hole. Assemble rosette as shown so that the valve body
thread shows at top. 

Ensure that the connection for the flexible hose is facing
towards the nozzle.

Spacer washer to be used in installations where work
surface has a thickness ranging from 1/8” to 1 7/8”.

Assemble cover & handle onto the valve body ensuring that
it is aligned properly.  If it is not, re move and turn a few
splines until correct align ment achieved.

Screw the rosette up to the underside of cover. 

Repeat this procedure for the cold valve.

Congratulations on the purchase of your Perrin & Rowe Bathroom Faucet. 

Correctly installed and with sensible care, it will give many years of trouble free service.

Fig 1.

Installation of Faucet

Before you proceed... 

We recommend you engage the

services of a registered plumber to install this product.

Read the instructions on this leaflet carefully.

U.3700L-2  U.3701X-2  U.3705L-2  U.3706X-2  U.3720L-2  U.3721X-2
U.3730L-2  U.3731X-2  U.3741L-2  U.3742X-2  U.3760L-2  U.3761X-2

U.3765L-2  U.3766X-2

3

3    H

H o

o l

l e

e    W

W ii d

d e

e s

s p

p r

r e

e a

a d

d s

s

T h e   Tr a d i t i o n a l   B a t h ro o m   Co l l e c t i o n

I n s t a l l a t i o n   &   U s e r   G u i d e

Consult your local ROHL showroom for additional information and specifications. For complete warranty details and a list of showrooms, go to www.rohlhome.com.

Содержание Perrin & Rowe U.3706X

Страница 1: ...neered to increase the life of the valve 1 2 NPSM connections 1 3 4 max deck depth Polished Chrome Polished Nickel Satin Nickel Inca Brass English Bronze Limited Lifetime ROHL Perrin Rowe Bath Three Hole Low Level Spout Widespread Lavatory Faucet with Cross Handles Consult your local ROHL showroom for additional information and specifications For complete warranty details and a list of showrooms g...

Страница 2: ...www rohlhome com U 3706X Spare Parts Consult your local ROHL showroom for additional information and specifications For complete warranty details and a list of showrooms go to www rohlhome com ...

Страница 3: ... t c co ol ld d p pr re es ss su ur re es s A SS E M B LY Refer to Fig 1 Assemble the nozzle by placing the hoses through the hole in the worksurface ensuring that the base ring seal are in place Place clamp plate and securing nut onto the clamp bolt tighten with spanner provided to underside of worksurface To assemble sidevalve ensure the spacer ring clamp plate and securing nut are in place on t...

Страница 4: ...tating the handles a quarter turn When using pop up waste push down on plug to seal the waste prior to filling the bowl Push down on pop up knob to discharge waste water 9 12451 9 28400 9 03700 9 30701 9 18700 9 13146 9 01451 Hot 9 01451 Cold 9 12451 9 26410 Porcelain 9 24193 9 19193 9 21370 9 01372 9 26400 9 13145 Right 9 13146 Left 9 18380 9 01730 9 20730 9 18730 U 3730 U 3731 9 01730 9 26709 9 ...

Отзывы: