background image

INSTALLING BRACKETS

T O W E L   R A I L S

 Slide the WALL BRACKET 

1

  into the BRACKET ARM

2

  and hold up to the wall in position.

 With a pencil, outline the WALL BRACKET

1

  in the 

  desired position and remove from the wall.

 Using a pencil and the WALL BRACKET

1

, mark the 

  centre screw hole and cross it for accuracy.

 Drill a hole for the SCREW 

4

 and insert nylon plug into 

  tiled wall (if applicable). Installer may choose to use 
  alternative screws to suit the application.

 Position WALL BRACKET

1

  so that the GRUB SCREW 

  hole faces directly down towards the floor and place 
  SCREW 

4

 into the wall.

DO NOT OVERTIGHTEN SCREW - LEAVE SLIGHT 
ADJUSTMENT OF THE FLANGE (SLACK) TO ENABLE 
MOVEMENT WHEN THE TOWEL RAIL IS POSITIONED.

 When all of the WALL BRACKETS 

1

 are in place, slide 

  the TOWEL RAIL

5

 into position towards the wall, until 

  BRACKET ARM

2

reaches the WALL BRACKET

1

.

 Insert GRUB SCREW 

3

 through BRACKET ARM

2

 and 

  into WALL BRACKET

1

.

 With the ALLEN KEY

6

 provided, tighten the GRUB

  SCREW until tight to ensure that towel rail stays in position.

2

3

2

1

1

3

6

6

4

4

5

5

**INSTALLER MAY CHOOSE NOT TO USE SCREW IF NOT SUITABLE FOR APPLICATION

Wall Bracket 

Wall Screw**

Hydrotherm Towel Rail

Alen Key & Grub Screw

        Bracket Arm

              Grub Screw

Hydrotherm will not accept 

responsibility for incorrectly

installed brackets.

Please read instructions carefully.

Please ensure that the measurements are taken accurately
and that the screw is in a stud or noggin to provide support.
Do not overtighten screws.

STUD OR
NOGGIN

WALL

STUD OR
NOGGIN

WALL

WALL

ELEMENT

TOWEL RAIL

Side View

* Brackets 1 - 5 to be installed per instructions
  above.

* Bracket 6 with element cord connection will
  not require screw. Silicon can be used to fit 
  bracket to wall if necessary.

Отзывы: