INSTALLING BRACKETS
T O W E L R A I L S
Slide the WALL BRACKET
1
into the BRACKET ARM
2
and hold up to the wall in position.
With a pencil, outline the WALL BRACKET
1
in the
desired position and remove from the wall.
Using a pencil and the WALL BRACKET
1
, mark the
centre screw hole and cross it for accuracy.
Drill a hole for the SCREW
4
and insert nylon plug into
tiled wall (if applicable). Installer may choose to use
alternative screws to suit the application.
Position WALL BRACKET
1
so that the GRUB SCREW
hole faces directly down towards the floor and place
SCREW
4
into the wall.
DO NOT OVERTIGHTEN SCREW - LEAVE SLIGHT
ADJUSTMENT OF THE FLANGE (SLACK) TO ENABLE
MOVEMENT WHEN THE TOWEL RAIL IS POSITIONED.
When all of the WALL BRACKETS
1
are in place, slide
the TOWEL RAIL
5
into position towards the wall, until
BRACKET ARM
2
reaches the WALL BRACKET
1
.
Insert GRUB SCREW
3
through BRACKET ARM
2
and
into WALL BRACKET
1
.
With the ALLEN KEY
6
provided, tighten the GRUB
SCREW until tight to ensure that towel rail stays in position.
2
3
2
1
1
3
6
6
4
4
5
5
**INSTALLER MAY CHOOSE NOT TO USE SCREW IF NOT SUITABLE FOR APPLICATION
Wall Bracket
Wall Screw**
Hydrotherm Towel Rail
Alen Key & Grub Screw
Bracket Arm
Grub Screw
Hydrotherm will not accept
responsibility for incorrectly
installed brackets.
Please read instructions carefully.
Please ensure that the measurements are taken accurately
and that the screw is in a stud or noggin to provide support.
Do not overtighten screws.
STUD OR
NOGGIN
WALL
STUD OR
NOGGIN
WALL
WALL
ELEMENT
TOWEL RAIL
Side View
* Brackets 1 - 5 to be installed per instructions
above.
* Bracket 6 with element cord connection will
not require screw. Silicon can be used to fit
bracket to wall if necessary.