![Rogers 410474 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/rogers/410474/410474_manual_1477455009.webp)
8
Ground Mount Assembly Instructions
Place post assembly in the ground mount sleeve and
tighten pinch bolt.
3
2
1
4
The hole for setting the ground mount base should
be approximately 12” in diameter and 24” deep.
Set ground mount base in concrete so that the top
ring fits flush with ground level.
Pinch bolt
Slide Insert Posts into the gound mount uprights
and fasten with (2) ½” x 4” bolts, (2) ½” nuts, and (4)
½” washers. Be sure insert posts are at the same
height. Remaining assembly is the same as Steps 2
thru 6 of Zone Reactor Assembly.