25
25
EN
11.4
Selecting direction of aperture
&-32-/FEVVMIVWEVIGSRƼKYVIHF]HIJEYPXJSVMRWXEPPEXMSRSRXLIVMKLXLERHWMHIWIIRJVSQXLI
inspection hatch side).
Whenever corrective actions are carried out, pay the utmost attention when releasing, locking or
moving the internal mechanical parts. These operations could be hazardous for the installer.
*SVPIJXLERHMRWXEPPEXMSRW
•
9RPSGOXLIFEVVMIVWIIGLETXIV
•
8YVRXLIPMROEKIPIZIVEWWLS[RMRƼKYVI
•
1SZIXLIQIGLERMGEPWXST
•
0SGOXLIFEVVMIVWIIGLETXIV
OPENING
ON THE LEFT
OPENING
ON THE RIGHT
7
BARRIER INSTALLED ON THE RIGHT (SEEN FROM THE INSPECTION HATCH SIDE)
AND THE BOOM OPENING/CLOSURE GATE ON THE LEFT
BARRIER INSTALLED ON THE LEFT (SEEN FROM THE INSPECTION HATCH SIDE)
AND THE BOOM OPENING/CLOSURE GATE ON THE RIGHT
Содержание BI/004
Страница 2: ...2 ...
Страница 10: ...10 IT 4 6 5 90 3 ...
Страница 24: ...24 24 EN 4 6 5 90 3 ...
Страница 38: ...38 38 DE 4 6 5 90 3 ...
Страница 52: ...52 52 FR 4 6 5 90 3 ...
Страница 66: ...66 66 ES 4 6 5 90 3 ...
Страница 80: ...80 80 PT 4 6 5 90 3 ...
Страница 94: ...PL 94 94 4 6 5 90 3 ...
Страница 103: ...103 ...