8.2 Stacking System
(1) Connect the stacking bar, stacker and base stabilizer, using pins and safety clips, according to
the complete stacking system. (See 4.2.)
(2) Install two tiles on the stacking bar, which will attract tiles to the target position automatically
with magnets. And lock the rear bridge.
(3) Install the second stacking system, close to the first stacking system and keep them at the
same horizontal level through the adjustment wheel.