![Rocky's HIGH RISER Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/rockys/high-riser/high-riser_assembly-instructions_1476015002.webp)
HIGH RISER ASSEMBLY INSTRUCTIONS
011
025
109
Take the Anchor Bolt and put it
through the Spring and then the
Plastic Retainer, then put them
through one of the Anchor holes
in the High Riser Base. Repeat
these steps for both end units.
The Anchor Bolt assembly then
screws to the Concrete Anchor
when the system is in use.
015
For
regular
shaped pools, align the outside edge
of the tube parallel with the end of the pool.
For
irregular
shaped pools, the outside edge of
the tube should be a
minimum
of 3’ inside from
the end of the pool. Place the reel at the widest
point if that is possible for a better result.
Positioning Your Reel System
1/16”
015
Slug
Hit the center
slug with a
hammer &
center punch.
Drive the Concrete Anchor into the hole with a hammer. Ideally you would want
to leave the Anchor raised 1/16” above the pool deck, but if your hole is too
deep this might not happen as long as the Anchor Bolt can reach it, it will work.
To set the Concrete Anchor:
Hit the slug in the center of the Anchor (usually Red) with a hammer and center
punch, driving the slug down into the anchor forcing the legs out into concrete.
This is a friction fit so if you haven’t hit the slug hard enough it could lift out of
the hole, if this happens simply set the Anchor again.
Using one of the two holes in the Frame as a
guide, make mark #1 on deck. With a 1/2” con-
crete drill bit, drill a 1 1/2” deep hole at mark #1.
Before moving to the otherside set this Concrete
Anchor and screw in the Anchor Bolt so that the
reel remains stationary. On the other side of the
roller unit, make mark #2 by using one of the two
holes in the Frame as a guide. With a 1/2” concrete
drill bit, drill a 1 1/2” deep hole at mark #2.
NOTE
: Set one bolt at front of Frame on one end
and one at the rear of the Frame on the other
end.
Mark
#2
Mark
#1
4
5
6
7
Anchor Detail
Concrete Anchor Detail