
3-2
GV3000/SE Operator Interface Module (OIM) User Guide, Version 2.0
3.1.2 Equipment Needed to Install or Replace the OIM
To install or replace the OIM, you will need:
•
OIM kit (M/N 2RK3000)
•
Drill with 5.0 mm drill bit
•
#1 Phillips-head screwdriver
•
Strain relief for serial cable
3.1.3 Installing the OIM
To install the OIM:
Step 1. Disconnect power from the drive.
Step 2. Select the mounting location. The mounting location should be:
•
within 5 meters (16.4 ft.) of the drive
•
at eye level
•
easily accessible
Step 3. At the desired mounting location, drill two 5.0 mm holes and cut out the
opening in the enclosure door. Refer to figure 3.1 for enclosure cutout
dimensions.
!
ATTENTION: Do not install or remove modification kits with power
applied to the drive. Disconnect and lock out incoming power before
attempting such installation or removal. Failure to observe this
precaution could result in severe bodily injury or loss of life.
Содержание Reliance electric GV3000/SE
Страница 6: ...IV GV3000 SE Operator Interface Module OIM User Guide Version 2 0 ...
Страница 8: ...VI GV3000 SE Operator Interface Module OIM User Guide Version 2 0 ...
Страница 12: ...1 4 GV3000 SE Operator Interface Module OIM User Guide Version 2 0 ...
Страница 20: ...2 8 GV3000 SE Operator Interface Module OIM User Guide Version 2 0 ...
Страница 87: ...A 18 GV3000 SE Operator Interface Module OIM User Guide Version 2 0 ...
Страница 101: ...B 14 GV3000 SE Operator Interface Module OIM User Guide Version 2 0 ...
Страница 111: ......