Installation
Node Controller Installation
88
MagneMotion
Rockwell Automation Publication MMI-UM013B-EN-P - April 2020
2.
Clip the node controller onto the DIN rail in the appropriate location. Make sure that
the service and exclusion zones are maintained.
3.
Install cable management as required to secure the cables that are connected to the
node controller.
Surface Mounting
The NC-S can be mounted to a convenient surface by attaching the optional mounting brack-
ets are shown in
Figure 5-2: NC-S Node Controller Surface Mounting
1.
Align each mounting bracket to the node controller and secure them with the supplied
M5 screws. Tighten to 1.1 N•m [10 in•lb].
2.
Locate the node controller as required and secure it with a minimum of two screws per
mounting bracket. Make sure that the service and exclusion zones are maintained.
3.
Install cable management as required to secure the cables that are connected to the
node controller.
M5 Screw
(6X)
Mounting Bracket
(2X)
Содержание MagneMotion 700-0871-00
Страница 140: ...140 MagneMotion Rockwell Automation Publication MMI UM013B EN P April 2020 This page intentionally left blank ...
Страница 146: ...146 MagneMotion Rockwell Automation Publication MMI UM013B EN P April 2020 This page intentionally left blank ...
Страница 147: ...Node Controller Hardware User Manual 147 Rockwell Automation Publication MMI UM013B EN P April 2020 Notes ...