94
Rockwell Automation Publication 2198T-UM002C-EN-P - March 2019
Chapter 5
Maintenance
Install Curved Transverse Rail
Use this procedure to install transverse curved rails.
Before You Begin
Install transverse straight rails before you install the transverse curved rails.
What You Need
• M5 x 0.8 x 20 mm low head socket cap screw (X12)
• A transverse curved rail segment
• 4 mm hex driver
• Loctite 243
• Two straight-to-straight rail alignment clamps, from the 2198T-A04
iTRAK TriMax rail aligning tool kit
To install a transverse rail, complete these steps.
1. Loosen the two straight rail end screws that are next to curve.
2. Place curved rail in position.
3. Push apex of curved rail with 10…15 lbf so that rail faces are flush with
straight rails, see detail A.
ATTENTION:
Before attempting any service to an iTRAK system. See
Transverse Curved Rail
Detail A
Put 10…15 lbf on apex
of curved rail.
Straight-to-straight Rail
Alignment Clamp (X2)
M5 x 20 LHSC (X12)
A
Check that rail
ends are flush.
Содержание iTRAK
Страница 1: ...iTRAK System with TriMax Bearings Bulletin 2198T User Manual OriginalInstructions...
Страница 6: ...6 Rockwell Automation Publication 2198T UM002C EN P March 2019 Table of Contents Notes...
Страница 44: ...44 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 2 Track Installation Notes...
Страница 60: ...60 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 4 Power onYour System Notes...
Страница 102: ...102 Rockwell Automation Publication 2198T UM002C EN P March 2019 Chapter 5 Maintenance Notes...
Страница 121: ...Rockwell Automation Publication 2198T UM002C EN P March 2019 121 Index Notes...
Страница 122: ...122 Rockwell Automation Publication 2198T UM002C EN P March 2019 Index...
Страница 123: ......