Rockwell Automation Publication 1502-UM060A-EN-P - October 2020
37
Chapter 4 Maintenance
High Potential Voltage (HiPot) and Insulation Resistance Test
The internal dielectric condition and vacuum integrity of the vacuum bottles is
determined by this test.
See
to check the vacuum bottle integrity.
See
to check the insulation resistance.
Lubrication
Using AeroShell No. 7 (1 oz tube, Part No. 40025-198-01), grease the actuator
plate where the overtravel springs and washers make contact (
).
Figure 21 - Grease Locations
Vacuum Bottle
Replacement
Rockwell Automation does not recommend that the vacuum bottles be
replaced in the field. If the vacuum bottles need to be replaced, remove and
return the entire vacuum contactor to Rockwell Automation for
refurbishment.
Coil Replacement
Procedure
See
for the part numbers that are required for this
procedure.
1. Remove the auxiliary actuator, front stop bracket, and armature plate as
shown in
Do not remove the bolts that secure the stop bracket. Loosen them and
slide out the bracket.
IMPORTANT
Do not grease the armature shaft plastic bearings. These
bearings are self-lubricating and do not require grease.
Insulator
Actuator Plates
Grease
Grease
Содержание Allen-Bradley G Series
Страница 1: ...Medium Voltage 450 A Contactor Series G Bulletin Number 1502 User Manual Original Instructions ...
Страница 6: ...6 Rockwell Automation Publication 1502 UM060A EN P October 2020 Notes ...
Страница 16: ...16 Rockwell Automation Publication 1502 UM060A EN P October 2020 Chapter 1 Product Description Notes ...
Страница 20: ...20 Rockwell Automation Publication 1502 UM060A EN P October 2020 Chapter 2 Receiving and Handling Notes ...
Страница 48: ...48 Rockwell Automation Publication 1502 UM060A EN P October 2020 Chapter 4 Maintenance Notes ...
Страница 50: ...50 Rockwell Automation Publication 1502 UM060A EN P October 2020 Chapter 5 Troubleshooting Notes ...