32
Rockwell Automation Publication 750-TG101A-EN-P - June 2022
Chapter 3 Component Inspection and Tests
7. For frames 6 and 7, inspect the power interface, and AC precharge or DC
precharge circuit boards. If any components, particularly the resistors,
show evidence of burn marks or breakage, replace the circuit board
without further testing.
• For frame 6 power interface circuit board, see page
• For frame 6 AC precharge circuit board, see page
• For frame 6 DC precharge circuit board, see page
• For frame 7 power interface circuit board, see page
• For frame 7 AC precharge circuit board, see page
.
• For frame 7 DC precharge circuit board, see page
.
Forward and Reverse Biased
IGBT/Diode Tests
Follow these steps to perform forward and reverse biased IGBT/diode tests on
the power modules. A failed test indicates damage to the components in the
power modules and requires replacement of the drive.
1. Review the
.
2. Remove power from the system. See
Remove Power from the System on
3. Select the “Diode Test” mode on the digital multi-meter and complete the
forward and reverse biased diode tests on the power module for your
product frame size. See
for
terminal locations and identification.
4. If the product fails the measurements that are identified in
, replace the drive.
5.
before placing the drive
back into service.
IMPORTANT
The actual voltage readings can vary depending upon your equipment. If
your readings are not near the indicated values in
verify
that the actual voltage that is measured is consistent for each phase of the
power module.
Table 1 - Forward Biased Diode Tests on the Converter IGBT Assembly
Meter Leads
Nominal Meter Reading
+
-
–DC
U/T1
0.36V
–DC
V/T2
–DC
W/T3
U/T1
+DC
V/T2
+DC
W/T3
+DC
Table 2 - Reverse Biased Diode Tests on the Converter IGBT Assembly
Meter Leads
Nominal Meter Reading
+
–
U/T1
–DC
“.0L” (open circuit)
(1)
(1) Residual voltage on the DC bus capacitors can affect this reading. If the capacitors are discharged (less than 1 volt),
the meter initially shows a low voltage. This voltage reading is the residual bus voltage plus the drop through the low
side diodes. The meter gradually charges the bus, and the voltage slowly increases, until eventually the meter
switches to “.OL”. This increase can take several minutes to occur.
V/T2
–DC
W/T3
–DC
+DC
U/T1
+DC
V/T2
+DC
W/T3
Содержание 20G2
Страница 8: ...8 Rockwell Automation Publication 750 TG101A EN P June 2022 Notes ...
Страница 126: ...126 Rockwell Automation Publication 750 TG101A EN P June 2022 Chapter 5 Frame 6 Renewal Kits Installation Notes ...
Страница 194: ...194 Rockwell Automation Publication 750 TG101A EN P June 2022 Index Notes ...