background image

 

 

 

 

 

 

 

 

 

 

 

 

 

   
   

Part   U   

Part V 

   

Qty 4 or 6 - 

PART V

 – Side Door Stopper, 4 pieces for the 18U and 27U, 6 pieces for 42U racks. 

Содержание 18U

Страница 1: ...Rocelco Racks 18U 27U 42U Assembly Instructions and Parts List...

Страница 2: ...Qty 17 42U Qty 17 Part B M8 Allen Head Bolt 18U Qty 17 27U Qty 17 42U Qty 17 Part C M5 10 Self Tapping Screw 18U Qty 40 27U Qty 40 42U Qty 48 Part D M4 8 Self Tapping Screw 18U Qty 16 27U Qty 16 42U Q...

Страница 3: ...L...

Страница 4: ...Part U Part V Qty 4 or 6 PART V Side Door Stopper 4 pieces for the 18U and 27U 6 pieces for 42U racks...

Страница 5: ...rts J The one with the hole for the LCD panel is the front and the other is the back Face the LCD hole towards the outside The jack nuts toward the inside Step 2 Put on the Top Cover Part I Step 3 Put...

Страница 6: ...Step 4 Use M8 Allen Head Bolt to fix the Top Part I and Bottom Cover Part H...

Страница 7: ...nuts Part E on horizontal rack support Part K and Frame Part J and put horizontal rack support Part K on the Frame Part J Step 6 Use M6 Allen Head Bolt Part F to fix the horizontal rack support Part...

Страница 8: ...Step 7 Use M6 Allen Head Bolt Part F and M6 Cage Nuts Part E to fix the vertical rack rail Part L...

Страница 9: ...Step 8 Use M5 Self Tapping Screws Part C to fix 4 castors Part P on the Bottom Part H...

Страница 10: ...Step 9 Ready the fan tray Part R to connect to the LCD control Panel Part U Step 10 Feed the fan cable and plug cable through the hole on the frame...

Страница 11: ...Step 11 Use M4 Self Tapping Screw Part D to fix the Bottom Panel Step 12 Install Both the Left and right side panels Part M Finished Frame Installation...

Страница 12: ......

Страница 13: ......

Страница 14: ...15 16...

Страница 15: ...k to help you complete your installation including vented shelving blank filler plates AC power strips extra rack bolt cage nuts sets Please contact your dealer distributor to order additional racks o...

Отзывы: