
Transport and positioning
Installation, use and maintenance manual – TS 2000
11
2
7. Adjust the length of the pipes (intake and exhaust)
to the effective wall thickness, cutting the tract in ex-
cess: for the exact length determination, see Figure
Figure 3.2
Correct positioning of the support bracket
A Holes for securing the support bracket to the wall
A
Figure 3.3
Length of intake and exhaust pipes
A Wall thickness
B
Flue gas exhaust pipe
C
Air pipe
A + 9 cm
A + 1 cm
A
60
100
B
C
8. Remove the casing from the heating body by un-
screwing the screws at the top and bottom (see figure
3.4
p. 11).
9. Insert the flue gas exhaust pipe B in the combustion
chamber. Fit the air pipe C and then fix it to the appli-
ance with the screws provided, inserting the sealing
gasket D (see Figure 3.5
10. Place the gas-fired convector on the wall by introduc-
ing the intake/exhaust pipe into the hole previously
made and hooking the gas-fired convector to the sup-
port bracket by means of the specific holes G on the
back of the gas-fired convector (see Figure 3.5
11. Secure the heating body to the wall by tightening the
two locking screws on the support bracket. Further
minor adjustments to the position can be made at this
stage.
12. Connect the gas network as described in Paragraph
3.3
13. Fit the casing and tighten the locking screws (see
Figure 3.4
p. 11).
Figure 3.4
Remove the casing by unscrewing the screws
Figure 3.5
Installation of coaxial pipes and terminal
A Support bracket
B
Flue gas exhaust pipe
C
Air pipe
D Gasket
E
External windproof terminal
F
Holes for fixing the terminal
G Support bracket fixing holes
A
B
C
D
E
F
F
F
G
G