![ROBUA GAHP A Series Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/robua/gahp-a-series/gahp-a-series_installation-use-and-maintenance-manual_1471488029.webp)
First start-up
Installation, use and maintenance manual – GAHP A
29
5
Figure 4�7
Wiring diagram for connection of Wilo Stratos Para variable rate pump
IP
Two-position pump power
switch
F
Fuse
PM
Hot water circulation pump
(primary circuit)
Pump signal 0-10V wire colours
brown connect to -ve
white connect to +ve
black isolate
blue isolate
Figure 4�8
Wiring diagram for hooking up the Wilo Stratos Para variable rate pump powered by the unit
PM
Hot water circulation
pump (primary circuit)
MA
unit terminal block
Pump signal 0-10V wire colours
brown connect to -ve
white connect to +ve
black isolate
blue isolate
5
FIRST START-UP
First Start-Up entails checking/setting up the combus-
tion parameters and may exclusively be carried out
by a Robur TAC. NEITHER the user NOR the installation
technician is authorised to perform such operations,
under penalty of voiding the warranty.