3
SECTION
No
TITLE
ASSEMBLY SYNOPSIS: IMPORTANT INFORMATION / CONSIDERATIONS
PARTS LIST
Most components should have a ‘D’ code punched into their metal surface. Identify and sepa-
rate all like for like components prior to assembly. The ‘parts list’ also separates parts into the
various sections shown below. Parts can also be identified by their profile pictures and stated
lengths etc..
B
BASE
Base dimensions and recommendations. Ensure that your base is level as this will make as-
sembly of the building, especially the glazing of the roof much more straight forward.
P
PREPARATION Tools required. IMPORTANT: Use WD40 or similar in the glazing bar channels and insert the
black glazing rubber prior to frame assembly.
1
SIDES
Take the side glazing bars ‘D609’ with the rubber inserted and the diagonal braces ‘D604’,
use 10mm bolts to join them to the gutter and 15mm bolts to the cills (note how the head of
the bolts slide into each glazing bar during construction).
2
FRONT
Again insuring that the gable framework is rubbered-up follow the diagrams to assemble each
end of the building. Make sure that you have inserted the extra bolts utilised in sections 4, 5
and 10. On the roof and side corner bars not every rubber channel will require rubber unless it
is to be utilised in a partition (see separate manual and section P).
3
REAR
4
JOINING THE
FOUR SIDES
Take the two sides (1) and both gables (2 & 3) and join them together on your base. It is a
good idea to tie some ladders to the sides to support them if you do not have anyone to hold
them for you.
5
ROOF
Attach ridge and then the rubbered-up roof bars ensuring that they are fully butted up to the
ridge and down onto the gutter. If you have cresting then it is a good idea to fit it before glaz-
ing, see section (15).
6a
VENT
Once the vent is glazed add silicone to the vent sides and top. Stand the vent/s on their hinge
(vent top) and then leave the silicone to set.
6b
VENT SLAM
The slam bar ‘D079’ can be moved up and down between the roof glazing bars so that it can
be butted down onto the pane of glass beneath, the autovent will be attached to it later on (9).
7
DOOR
Construct the door using the diagrams and then leave to one side ready for attachment in
section (10).
8
GLAZING
Layout the bar capping and covers around the building like a sundial checking that all is pre-
sent and correct. You can also place the roof capping in the gutters so they are closer to
hand. The glass in the ends has to bevel on the black separator strip which this bevelling ac-
tion allows the glass to tuck underneath the roof corner canopy. Use the capping and the self
tapping screws to then hold the glass in place. The covers then enclose the screw heads giv-
ing a neat finish. A top tip is to not attach the door post capping (D814/D836) until you have
fitted the door runner and threshold (10) to give you more room to manoeuvre. It is a good
idea to glaze two roof sections first to ensure the building is square followed by two side sec-
tions to ensure the building isn't leaning,
9
VENT
ATTACHMENT
Take the assembled vent and slide the vent hinge ‘D866’ into the end of the ridge allowing the
vent the pivot open and closed. Vent stops go either side of the vent to stop any lateral move-
ment (so insert stop / vent / stop). Attachment of the Bayliss XL autovents.
10
DOOR
ATTACHMENT
Utilise the bolts inserted in section (2) to attach the upper door track. The lower door runner
’D860’ and ramp threshold ‘D087’ push down and lock together.
11
ANCHORING
DOWN
Now that the greenhouse is finished and the door and vent/s are operating without interfer-
ence then you need to anchor the building down using 2” rawl plugs and screws. Use a 7mm
masonry bit in a hammer drill to create the holes.
12
OPTIONAL
LOUVRE
They attach to the building during the glazing process (8) like a piece of glass with a black
separator above and below them.
13
OPTIONAL
SHELVING
14
OPTIONAL
STAGING
15
FINISHING
TOUCHES
Now that the main body of the structure is complete you can add; ridge caps, downpipe fit-
tings, eave bungs. Images showing cresting and finial attachment, this is often easiest to do
after section (5) rather than using the vent apertures later on (i.e. before glazing).
Robinsons integral cantilever staging and shelving attaches to the inside of the greenhouse
frame using either square head bolts (insert four into each side glazing bar ’D609’ during con-
struction of the sides (1)) or rectangular ‘crop head’ bolts which can be fitted retrospectively
(both sets of bolts accompany the shelving/staging). This system allows the height of either
the staging or the shelf to be set at an operator specific height. Commonly the staging brack-
ets are set 900mm from the cills though you can alter this to suit the end user/s. The alumin-
ium shelf / staging slats come in two lengths; (4’):1240mm ‘D2002’ and (6’):1860mm ’D2003’.
These slats can combine to create any length of staging required, i.e. 4’+6’ = 10’ etc...
Содержание DWARF
Страница 9: ...9 D604 TRANSIT BOLT ON DIAGONALS 15mm D604 15mm D609 10mm D609...
Страница 11: ...11 D628 D604 D607 D606 D607 D607 D850L D608 D174 D111 D850R D850L D850L D608 D604 D606 D607...
Страница 13: ...13 D601 D850L D608 D036A D174 D604 D601 D036A D850L D608 D604 D111 D850R D850L...
Страница 14: ...14...
Страница 17: ...17 D862 D862 D863L 2 2 2 2 2 FLIP VIEW D119 CUT 6mm SILICONE...
Страница 19: ...19 D1210 GLASS D893 GLASS D893 GLASS...
Страница 24: ...24 D220 D220...
Страница 25: ...25 D079 D862...
Страница 27: ...27 D864 D084 D083 15 3 N A 3 D627 15 2 N A 2 D864 15 4 N A 4...
Страница 29: ...29 D842 1 D112 1 SYBOLM6 X11CROP 3 Part No Q D112...
Страница 30: ...30 O7mm...
Страница 35: ...35 FINISH START EQUAL EQUAL ROFIN W G ROFIN W G ROCRE W G START FINISH D119 CUT 6mm SILICONE...