Partitions may be fitted at any glazing bar position in the greenhouse. It is advisable to 

complete

 the partition including 

glazing before the rest of the structure to make its fitting more straight forward as you will have more space to work.  
 
Unlike the main building where you construct the gables whole and attach them it is better with a partition to build it in 
situ, i.e. build up the partition around the adjoining frame utilising the specially slotted side and roof corner bars.  The slot 
allows the ridge, gutter and base rail to pass through. Make sure that you orientate the bars the correct way around to 
match the front of your building. If however the partition is required on a joint between a main building and extension 
module, the reinforcing A-frame normally fitted between two building sections is no longer used. It is imperative in this 
situation that the partition faces the main building checking that you have maintained the 620mm hole spacing's required 
for the glass to successfully fit. (See diagram).  
 

 

 

MAIN MODULE 

EXTENSION 

DOOR / S 

DOOR / S 

FRO

N

REAR 

PARTITION 

Feed glazing rubber into each glazing bar and 
trim to length. Notice that some channels are 
only used on a partition. Applying a lubricant to 
the aluminium channels will speed up insertion. 

 

PARTITION 

ONLY 

 

PARTITION 

ONLY 

Содержание Partition

Страница 1: ......

Страница 2: ...id placing your greenhouse under trees or in other vulnerable locations To minimise the risk of wind damage try to select as sheltered a site as possible e g beside a hedgerow or garden fence Addition...

Страница 3: ...hrough Make sure that you orientate the bars the correct way around to match the front of your building If however the partition is required on a joint between a main building and extension module the...

Страница 4: ...ble end leaving the two top shapes Fit single header to track inner and outer and position on top of door posts Secure with attachment plates using a special double one between the two You can then co...

Страница 5: ...tition door tracks and header Identify special door track support angles D155 and fit to roof end bars then fit door track to these Slide door on as you go Glazing can then be completed above the door...

Страница 6: ...go Glazing can then be completed above the door It would be advisable to complete all this work before glazing the main structure D204R D312 FS6018 O4mm through metal only FS6018 D041R D049 D041L REGA...

Страница 7: ...then be completed above the door It would be advisable to complete all this work before glazing the main structure D204R D312 FS6018 O4mm through metal only FS6018 D049 D049 D086 D085 D720 D1254 D125...

Страница 8: ...DOOR D1216 D1216 D911 D912 D912 D625 D625 D901 D901 D622 D622 D964 D696 D693 D697 D902 D902 D701 D701 D703 D699 REGAL DWARF SINGLE DOOR D1216 D1216 D1216 D1216 D1216 D912 D890 D908 D908 D900 D900 D62...

Страница 9: ...BLE DOOR D1216 D1216 D1216 D1216 D911 D912 D912 D623 D908 D908 D900 D900 D623 D701 D701 RENOWN DWARF DOUBLE DOOR D625 D902 D1216 D901 D911 D912 D912 D1216 D907 D625 D902 D1216 D901 D1216 D907 D890 D89...

Страница 10: ...st be slid into the top track and erected as a complete unit Glaze as for door end It is advisable to complete all this work before glazing the main structure REACH ROYALE D856L D856R D780A D780A REAC...

Страница 11: ...ing the D2056 G needs to be drilled and mounted between the gutter and the cill It is also necessary to reduce the length of the aluminium slats so that they do not interfere with the partition glazin...

Страница 12: ...y errors or have any constructive comments regarding the manual please email james spooner greenhousepeople co uk and I will make the necessary amendments Whilst the information contained in this book...

Отзывы: