![Roberts Gorden DF Скачать руководство пользователя страница 48](http://html.mh-extra.com/html/roberts-gorden/df/df_installation-operation-and-service-manual_1469679048.webp)
DF-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
44
8.8 Horizontal Venting (Category III) 4" (10 cm) Pipe
Vertical Venting (Category III) 4'' (10 cm) Pipe
NOTE:
It is required that all vent pipes and connectors be fastened together with sheet metal screws and sealed with
high temperature silicone sealant approved for at least 550 °F (288 °C) (supplied by others). The installer
must perform a leak test on the complete venting system. A solution of soap and water should be used to
test the venting system.
Description
Part Number
Vent Terminal (Comb. Wall)
90502100
Vent Terminal
02537801-XX
Description
Part Number
Vent Cap 4" (10 cm)
90502300
Содержание DF
Страница 2: ......
Страница 4: ......
Страница 21: ...SECTION 6 HEATER INSTALLATION 17 FIGURE 16 Linear Heater Assembly Overview ...
Страница 22: ...DF SERIES INSTALLATION OPERATION AND SERVICE MANUAL 18 FIGURE 17 Linear Heater Layout Overview ...
Страница 37: ...SECTION 7 OPTIONAL HEATER ACCESSORIES 33 FIGURE 25 U Tube Heater Layout Overview ...
Страница 58: ...DF SERIES INSTALLATION OPERATION AND SERVICE MANUAL 54 10 3 Internal Wiring ...
Страница 59: ...SECTION 10 WIRING 55 10 4 Ladder Diagram 10 5 Electrical Connection to the Burner ...
Страница 64: ...DF SERIES INSTALLATION OPERATION AND SERVICE MANUAL 60 12 1 Troubleshooting Flow Chart ...
Страница 65: ...SECTION 12 TROUBLESHOOTING 61 ...
Страница 66: ...DF SERIES INSTALLATION OPERATION AND SERVICE MANUAL 62 12 2 Manifold Gas Pressure Setting ...
Страница 68: ...DF SERIES INSTALLATION OPERATION AND SERVICE MANUAL 64 ...
Страница 72: ......
Страница 73: ...2020 ...
Страница 74: ......