B
LACKHEAT
®
AG I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
18
Step 6.4.1 Couplin
g
and Tube Assembly (Continued)
Step 6.4.2 Couplin
g
and Tube Assembly (Continued)
Incorrect Slide Bar
position
Correct Slide Bar
dimensions
± 50 mm
Drive slide bar until tight.
End of slide bar should be
within tolerance listed below.
• Repeat
Step 6.4
A - D until all tubes are assembled.
See Page 18, Section 6.4.2
shown below.
Ti
g
hten slide bar as shown below.
3050 mm Typ
± 250 mm
2290 mm
± 250 mm
Total Overall
T
ub
e Length
W
eld spot
at end of
heat exchanger
Model
Overall Tube Len
g
th (mm)
Number
of Tubes
AG15ST
6000
2
AG20ST
9000
3
AG25ST
9000
3
AG30ST
12,000
4
AG35ST
12,000
4
AG40ST
12,000
4
AG45ST
15,000
5
AG50ST
15,000
5
AG55ST
18,000
6
Содержание AG15ST
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 45: ...SECTION 11 WIRING 39 11 4 Internal Wiring Diagram ...
Страница 53: ...SECTION 14 TROUBLESHOOTING 47 Troubleshooting Flow Chart Linear and Double Linear ...
Страница 61: ......