Installation and Operating Instructions
PARU-Mini-S
PARU-Mini-XS
Страница 1: ...Installation and Operating Instructions PARU Mini S PARU Mini XS...
Страница 2: ...tion 10 2 5 Tooling development 10 3 Installation Instructions 11 3 1 Shipping and handling 11 3 2 Installation 11 3 3 Commissioning 12 4 Operating Instructions 13 4 1 Operation 13 4 2 Tooling change...
Страница 3: ...35 EU Low Voltage 2014 30 EU Electromagnetic Compatibility EN 614 1 2006 A1 2009 EN ISO 13857 2008 EN 618 2002 A1 2010 EN ISO 14120 2015 EN ISO 12100 2010 EN 60204 1 2006 The relevant technical docume...
Страница 4: ...damage and minor or moderate injury Notice Indicates general information useful tips and recommendations which have no influence on the health and safety of PARU users The intended use of PARU Mini is...
Страница 5: ...prerequisite for working on the PARU Reading of the technical documents related to the PARU drive is part of this instruction session 2 Qualified personnel Qualified personnel are able to independentl...
Страница 6: ...fully exploit its functionality it is imperative that you use this product in conformity with this operating and installation instruction manual Beside the configuration of the tooling the controller...
Страница 7: ...80 Mass excl tooling kg 1 8 3 0 Power input VA 15 19 Current input A at 230V 0 07 0 08 Current input A at 110V 0 16 0 17 Magnet article code for 230V 39930322 39930334 Magnet article code for 110V 399...
Страница 8: ...U Mini all screws have property class 10 9 or better ISO 4762 M4 screws of leaf spring Nm 4 5 ISO 4762 M5 screws of leaf spring Nm 6 5 ISO 4762 M6 screws of leaf spring Nm 9 ISO 4762 M4 screws of spri...
Страница 9: ...ere frequency controllers with selectable output frequency are used an EMC metal gland and a shielded cable are provided The vibratory feeder is controlled by a low loss electronic control unit The ch...
Страница 10: ...vibrating components The tooling is part of the useful mass and is fastened to the useful mass plate 3 by means of clamps for example The connection for user s earth 5 is located on the baseplate We r...
Страница 11: ...npack and install it at the intended site After removing PARU Mini from its packing you should first make a visual inspection of all visible surfaces and clean the unit as necessary to remove any soil...
Страница 12: ...operating instructions for the control unit used As PARU Mini is incomplete machinery the interaction between PARU Mini and user s receiving station is to undergo a risk analysis to be conducted by u...
Страница 13: ...s Operation of PARU Mini is permitted only if the enclosure is installed and user s safety circuitry is functional Operators assigned by the equipment user can be trained on the PARU Mini by Rhein Nad...
Страница 14: ...l equipment Make functional test P h Tighten loose connections remove charred cables components Couplings connections P N h Observe tightening torques SRA Z drive Clean from dirt R w Pay attention to...
Страница 15: ...led according to their materials Please contact Rhein Nadel Automation GmbH if you want to return the PARU Mini unit Spare parts must satisfy the technical requirements specified by us This is always...
Страница 16: ...the individual batches from the setpoint parts Send the results to Rhein Nadel Automation GmbH and request a quotation for a tooling that is optimized for these varying part batches with the help of s...
Страница 17: ...ndling systems ch RNA Vibrant S A Carrer de l Energia 08940 Cornell de Llobregat Barcelona Spain Phone 34 0 93 377 7300 E mail info vibrant RNA com www vibrant RNA com RNA Digital Solutions GmbH Agnes...