![RMB/Energie neoTower Premium L Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/rmb-energie/neotower-premium-l/neotower-premium-l_operating-manual_1467279020.webp)
20
Assembly
Operating manual neoTower® Premium L / 03.2017
Exhaust air
A
Connect the line to the “exhaust air” connection on the
generation unit.
A
Guide the line outside.
A
Secure the line.
A
Ensure that when the exhaust air duct is connected,
the system remains protected against frost and the
elements.
Gas
The gas supply must comply with the established regulations
(e.g. in Germany, TRGI). Connection via a gas appliance
outlet is not permitted.
A
Connect the line to the “gas” connection on the
generation unit.
A
Connect the line to the connection on the gas supply.