Installation
Prior to installation:
•
Check for shipping damage
•
Check the contents to ensure correct model and fiber type
•
Have a clean, dry installation environment ready
•
Ensure that the fiber type at the site matches the system type
If damage is discovered file a claim immediately with the carrier, then contact RLH customer service.
Required for installation:
•
24-56VDC (60mA@24VDC maximum) line or local power source at each side of the system.
•
Suitable RLH Fiber Link Card housing
•
Active T1 line
•
Multimeter
You will need a T1 analyzer such as a T-BERD and a multimeter
Be familiar with the test settings. Some analyzers have line power and multimeter capability. For installation
where no T1 signal is available, the analyzer must be capable of generating a T1 signal.
"
Required power sources if installing before T1 service is available at the site
You will need to power the system to test it. Use a separate power source for powering the CO and Sub side
card. A battery may be used.
"
+
–
24 - 56VDC
AC Volts
Power Source
Power Source
24 - 56VDC
AC Volts
OK
BATT
+
–
Multimeter
Multimeter
OK
BATT
Sub Side
CO Side
Use 22~24AWG solid wire for power supply connections.
Refer to the power supply connection and use information for fuse or circuit breaker requirements. Use caution
when handling copper wiring. Power connections may carry high voltages.
Fuses must be installed within a finger safe housing to prevent electric shock from accidental contact or during
fuse replacement.