10.
Slide the adapter flange (Fig. 29/2) onto the pulley boxes/
intermediate plates (Fig. 29/1).
11.
Tighten 4 screws each (Fig. 29/3), alternating diagonally:
Size
Screw size
Tightening torque [Nm]
40
M4
3
60, 80, 120 M8
25
12.
Position the protective tube in the adapter flanges and fix
them using the set screws (Fig. 29/4).
ð
The synchronisation shaft is assembled.
5.4.3 Assembling the drive shaft
Version
RK MonoLine Z
Size
40/80/120
Personnel:
n
Assembly staff
Protective equipment:
n
Protective clothing
n
Protective gloves
n
Safety shoes
Prerequisite:
n
The electric gear unit and/or motor (if available) are secured
against restarting.
1.
Place the centring collar of the adapter washer (Fig. 30/2) on
the timing belt shaft (Fig. 30/1).
2.
Tighten 4 screws (Fig. 30/3) alternating diagonally:
Size
Screw size
Tightening torque [Nm]
40
M4
3
80, 120
M8
40
Assembling the adapter flange
Fig. 29: Assembling the adapter
flange
Applicable to
Assembling the adapter washer
Fig. 30: Assembling the adapter
washer
Assembly
Assembling optional modules > Assembling the drive shaft
14.10.2021
Linear unit RK MonoLine R/RK MonoLine Z
105