background image

 

OPERATING MANUAL 

RL 6100 

Page 

 6 

Prepared by:

   O. 

Č

áp 

 

                                                                                                         

RIVETEC E120626

 

3

rd 

phase - when button is pressed /4/ to the first position will open the ball valve /5/, 

compressed air enters channels in the valve head /6/ and pushes the centering pin /3/ using 
a pneumatic piston /7/ to punching pin /1/  

 

 
4th phase – pressing the button /4/ to the end position of the main valve is open /8/ and 
compressed air is released under the main pneumatic piston /9/, the piston in the cylinder is 
pushed toward the hydraulic body /10/ and hydraulic rod /11/ pushes into the oil /12/, which 
pushes hydraulic piston /13/ to the rear position. Given that the hydraulic piston /13/ strongly 
associated with punching pin /1/, this also moves backwards and there is punching the 
material between the punching pin /1/ and punchinch nozzle /2/.  
 

 

10 

11 

12 

13 

Содержание RL 6100

Страница 1: ...Pneumatic hydraulic riveting tool with hexagonal holes intended for mounting hexagonal riveting nuts RIVETEC s r o Albrechtice nad Vltavou 19 CZ 398 16 Albrechtice nad Vltavou Tel 420 382 206 711 fax...

Страница 2: ...TS 1 TECHNICAL CHARACTERISTICS 3 2 TOOL DESCRIPTION 4 2 1 PREPARING BEFORE USE 4 3 OPERATION 5 3 1 DESCRIPTION OF FUNCTIONS 5 3 2 PUNCHING PROCESS 7 3 3 PUNCHING PINS CHANGING 9 4 MAINTENANCE 10 4 1 A...

Страница 3: ...0 l Notice to the terms of use and safety when using the punchong tool 1 Prohibition of use the tool in explosive atmosphere 2 Compressed air used must conform to ISO 8573 1 3 Periodically check the h...

Страница 4: ...ccessories from the safety valve Fig 2 Item 1 and air connection Fig 2 Item 2 and screw of your choice for the right or left hand one or the other side of the lower body of the device Safety valve wre...

Страница 5: ...phase tool is connected to compressed air all internal components are on the starting positions punching thorn 1 extends from the nozzle 2 centering pin 3 in the rear position and does not interfere...

Страница 6: ...button 4 to the end position of the main valve is open 8 and compressed air is released under the main pneumatic piston 9 the piston in the cylinder is pushed toward the hydraulic body 10 and hydraul...

Страница 7: ...on 3 2 Punching process 1 The circular hole drilled in the plate 2 Insert the punching collet to the hole that is pressed and skips to the edge of the cylindrical part when placing next to the hole 3...

Страница 8: ...terial up to 3mm 87 0001 87 0002 87 0003 87 0004 Punching set for material from 3 6 mm 87 0005 87 0006 87 0007 Punching pin for material up to 3 mm 87 0450 87 0451 87 0453 87 0455 Punching pin for mat...

Страница 9: ...ging Remove the front nozzle allow the nut and remove the pin We will exchange the pin secure the nut pin must always be free to rotate On the front nozzle mount the nose cap appropriate size to used...

Страница 10: ...and place it into the adapter 6 Add oil to the bottom visible thread rotation 7 Remove the syringe and remove the filling adapter 8 Give back the adding oil screw and tighten with internal hex key 4 9...

Отзывы: