Riverstone Networks Monticello Mont-8-BK Скачать руководство пользователя страница 3

WWW.RSIWW.COM

1 of 40

MONTICELLO Limited Warranty/ Liability 

Snow Load & Wind Load Warranty & Liability

The Monticello Greenhouse described in this manual is designed for and limited to Riverstone Industries standard 

wind and snow load which is based on a 

continuously heated

 greenhouse.   Standard loads are: Wind Load = 113 

MPH/ 1 second gust (52m/sec); 65 mph continuous winds, Snow load of 24 lbs. sq ft.      
Riverstone cannot and will not be held liable or responsible for any and all damages and/or structural failures caused 

by prevailing load conditions at the greenhouse’s erected location that exceed the aforementioned Standard Loads.  

All Monticello Wind & Snow loads are based on a closed and heated greenhouse structure. 

The heat provides a 

source for the snow and ice to melt from the roof.   If the Monticello is not being heated during the winter months when 

snow and/ or ice is present it is the owners responsibility to clear the accumulations of the roof.

Contact us directly with any questions regarding this.

Products to which this limited warranty applies: 

This limited warranty applies to the following models of your newly purchased Monticello Greenhouse:   

MONT-8; MONT-12,MONT-16,MONT20,MONT-24, MONT-4;  Premium versions, and Mojave Editions of 

these greenhouses.

 This limited warranty applies only to purchases made in any province of Canada except 

for Yukon Territory, Nunavut, or Northwest Territories or in any of the 50 States of the USA (and the District of 

Columbia) except for Hawaii and Alaska. This limited warranty applies to the original purchaser of the product 

only and is not transferable.

What this limited warranty covers and for how long:

Products covered by this limited warranty have been tested and inspected prior to shipment and, subject to the 

provisions of this warranty, Riverstone Industries warrants such products to be free from defects in material and 

workmanship for a period of 1 year from the date of the first purchase of such products.

The limited 10-year warranty period for GREENHOUSES also applies to any implied warranties that may exist under 

applicable law. Some jurisdictions do not allow limitations on how long an implied warranty lasts, so the above 

limitation may not apply to the purchaser.

The limited warranty for accessories follows the same guidelines as above and is covered for the following time span.

• Work Bench System – 10 years

• Watering System – 7 years

• Shade Cloth System – 7 years

• Garden/ Potting Sink – 3 years

What this limited warranty does not cover:

This limited warranty does not apply to products that have been repaired (except by Riverstone Industries or its 

authorized service representatives) or otherwise altered. This limited warranty does further not apply to defects 

resulting from misuse, abuse, accident, neglect, incorrect installation, improper maintenance or handling, or 

operation with an incorrect power source.

Riverstone Industries is not responsible for personal time lost or paid for during the construction of 

its products due to missing or defective parts.

What you must do to get service under this limited warranty:

Defects must be brought to the attention of Riverstone Industries Technical Service by contacting Riverstone 

Industries at 

[email protected]

 or 612-RVR-STNE (787-7863).  Please have proof of purchase, 

catalog/model and serial numbers available when calling.   Limited warranty service requires a proof of purchase 

of the product.

What Riverstone Industries will do in the event of a defect:

In the event a product or part covered by this limited warranty is proven to be defective in material or workmanship 

during the 10-year limited warranty period for products, you have the following rights:

Riverstone Industries will in its sole discretion either repair or replace such defective product or part without charge. 

If Riverstone Industries is unable to repair or replace such product or part, or if repair or replacement is not 

commercially practicable or cannot be timely made, Riverstone Industries may, in lieu of repair or replacement, 

choose to refund the purchase price for such product or part.

Limited warranty service will be performed solely by dealers or service agents of Riverstone Industries authorized to 

provide limited warranty services.

Содержание Monticello Mont-8-BK

Страница 1: ...Y 65 Fleetwood Drive Rockaway NJ 07866 Customer Service 877 373 3078 Email customerservice rsiww com After Hours Helpline 443 574 4764 8 x 8 Greenhouse Assembly Instructions Monticello Made in the USA...

Страница 2: ...osed In cooler snow prone climates Cut some 2 x 4 s and put them against the roof ridge and the floor to help add support from heavy snow and ice This is just a precaution but could save a lot of aggr...

Страница 3: ...so applies to any implied warranties that may exist under applicable law Some jurisdictions do not allow limitations on how long an implied warranty lasts so the above limitation may not apply to the...

Страница 4: ...t in one staging area The List of Parts has the corresponding step number referenced to each part so you can easily prepare for each step We recommend placing all parts in one staging area Lay out par...

Страница 5: ...in a cool dark place such as a garage until you are ready to use them Make sure the greenhouse complies with local building codes Heat the greenhouse during winter months to avoid accumulation of sno...

Страница 6: ...red for maximum strength The finished dimensions will be 101 by 1014 Materials Eight 10 pressure treated 2x4 lumber cut to 97 Fifty 8 3 wood screws Make sure each corner is square and then secure one...

Страница 7: ...f in one session Do not leave the roof unattended until it is completely assembled Place all like parts together in a staging area Prepare for each step according to instructions in this manual If any...

Страница 8: ...3 2 Step 10 E 4 1 Step 10 B 2 5 Step 3 5 B 3 30 Steps 2 3 4 5 10 B 4 9 Step 8 B 5 9 Steps 1 2 4 7 B 7 6 Steps 5 6 7 B 8 4 Step 1 B 10 2 Step 7 B 1 6 Step 6 Door Profiles QTY QTY Profile 24 x 57 W 1 21...

Страница 9: ...Brace Trim Plates Connectors Vent Opener QTY QTY QTY QTY QTY QTY QTY QTY T 3 T 4 G 3 A 1 A 2 B 9 T 2 S 10 1 1 4 4 4 1 1 1 Steps 2 3 4 Step 8 Step 8 Step 11 Step 11 Step 8 Steps1 2 3 4 5 6 7 8 9 10 Ste...

Страница 10: ...curing in place with a screwdriver Loosen T bolt means turning the T bolt so it is parallel in the bolt track and moves easily Try installing a few T bolts to determine how tightly you will need to tu...

Страница 11: ...number of T bolts in the correct bolt track in each profile The profiles have different amounts of T bolts on the inside and outside bolt tracks 1 2 NOTE Instructions identify twenty T bolts necessary...

Страница 12: ...corner Equal measurements ensure the base is square Use a spirit level to make sure the base is level 1 4A Locate predrilled holes in base profiles Use six S 4 screws one at each corner and one in th...

Страница 13: ...t facing outside The panels will help hold the profiles up during assembly 2 1B Continue working from inside Remove plastic film from both sides of one W 1 panel Fit panel into channel in base and cor...

Страница 14: ...iles Hand tighten end T bolts to hold in place 2 4b G 1 G 1 G 1 G 1 G 2 G 2 Place one T bolt on the inside bolt track of the gutter at each end Hand tighten both T bolts to hold in place 2 5b NOTE VIE...

Страница 15: ...rs on the outside of the greenhouse The B 3 connector uses the T bolt in the center hole of B 5 connectors at seams Loosen and slide T bolts to line up with connectors making sure the seams line up an...

Страница 16: ...56 72 QTY Connector B 3 S 2C S 7 2 4 2 Panels QTY W 1 2 24 x 57 3 1a Working from inside remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing...

Страница 17: ...ofile against spacer Repeat step 3 1C to secure WWW RSIWW COM 15 of 40 QTY Profile F 8 1 72 QTY Connector B 3 S 2C S 7 1 2 1 Panels QTY W 1 1 24 x 57 NOTE VIEW FROM INSIDE NOTE VIEW FROM outSIDE 3 2 R...

Страница 18: ...dge of F 1 and F 7 vertical profiles Profiles will fit snugly 3 3A Working from inside right corner place F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F...

Страница 19: ...ontract depending on the temperature To ensure proper placement use the 23 1 8 inch spacer included with the tools Continue working from inside back left corner Remove plastic film from both sides of...

Страница 20: ...king from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile at each end and the two longer G 2 gutter profiles in the...

Страница 21: ...ter hole of B 5 connectors at seams Loosen and slide T bolts to line up with connectors making sure the seams line up and the gutters remain straight Beginning at the seams arrange T bolts so middle b...

Страница 22: ...exactly as shown Use Phillips screwdriver to tighten S 7 bolts to hold D 8 hinges in place Turn profiles over Slide six T bolts into bolt track of both profiles and position as shown Fit B 2 connector...

Страница 23: ...rner profile Position right F 8 profile so single T bolt is next to base on inside and the cut edge angled down toward the nearest corner when installed B 2 connector is pointing towards door opening...

Страница 24: ...next to base on inside and the cut edge angled down toward the nearest corner when installed B 2 connector is pointing towards door opening Fit panel into channel in F 8 profile and slide F 8 profile...

Страница 25: ...embly into the top slot of the B 2 place the B 2 in position and adjust T bolts to fit B 2 connector Secure with two additional S 2C caps Prepare D 7 latch Fit S 8 bolts in holes in D 7 latch Line up...

Страница 26: ...ide Position door frame so barrel latch is on outside Loosen set screws on ends of F 5 profile and adjust position to fit holes in B 2 connector Secure with two bolts Ensure height to base is 68 Remov...

Страница 27: ...end touches top of G 1 gutter Position both F 7 profiles Use C 1 connector with three T bolt assemblies to secure each outside corner Make sure all profiles line up flush against each other Repeat on...

Страница 28: ...to B 1 connector with one T bolt assembly 6 1A Working from inside place F 2 profile on F 1 profile Make sure profiles are straight 6 1b From inside add connector B 7 to each corner Secure each with t...

Страница 29: ...its against cut angle of F 8 profile One end touches top of gutter and top end touches edge of F 2 center profile Position both F 7 profiles Use C 1 connector with three T bolt assemblies to secure ea...

Страница 30: ...ce Loosen and adjust position of set screws and long hex bolt to fit holes in B 5 connector Position B 5 connector with the long hex bolt in center hole and center to the seam where the profiles join...

Страница 31: ...back profiles Turn the roof ridge over so bolts face down and rest on top of front and back walls 7 3A Working from outside ensure all pieces are still flush and secure roof ridge to front Loosen set...

Страница 32: ...to install roof Allow enough time to complete this step and install and secure roof Do not leave roof unattended until it is completely assembled The roof panels are installed in the sections shown b...

Страница 33: ...in back left corner Fit one F 1 profile next to right panel F 1 profile rests against widest part of roof ridge and lines up with top of gutter Hold two profiles together at ridge using one B 4 connec...

Страница 34: ...tall F 1 profile on opposite side B 4 F 1 B 4 F 1 8 4A F 1 G 2 W 1 Return to back right to install section three and remove bungee cord Remove plastic film from both sides of one W 1 panel With side m...

Страница 35: ...F 1 profile so both panels fit in channels on sides of F 1 profile Slide the F 1 profile up towards the roof ridge As the profile moves up have the person on the inside guide it into place F 1 B 4 S...

Страница 36: ...S 2C caps The G 4 and G 4E trim plates snap into G 1 and G 2 gutter profiles to hold roof panels in place Working from outside begin at front corner Run a bead of silicone sealant along ledge of G 1 a...

Страница 37: ...ne up with holes in arm A Push arms apart if necessary Secure with a threaded stud on each side Remove plastic film from both sides of V 2 factory assembled vents With side labeled Face inside facing...

Страница 38: ...ith arm overlapping trim so adjusting screw can move freely Screw two S 1 screws through panel and into gripping channel on other side to secure Do not over tighten as it may damage the vent From insi...

Страница 39: ...Begin right door assembly Prepare one E 2 door profile Position with holes facing up Slide one D 9 corner connector into each end Slide E 1 door profiles into D 9 corner connectors and secure each wit...

Страница 40: ...in step 10 6B Turn door over and install handle on E 2 profile just secured Match two holes in E 2 with holes in D 6 handle Secure with two S 10 screws Repeat step 10 1 through 10 2A to assemble left...

Страница 41: ...and F 5 profiles that make up the door frame and to inside E 1 bottom door profiles This tape acts as insulation Make sure it is smooth and even Working from inside with left door open and right door...

Страница 42: ...platform until each screw is flush with base profile Continue process around outside and inside until greenhouse is evenly secured Attach anchor bracket with two T bolts in the inside bolt channels in...

Отзывы: