background image

WWW.RSIWW.COM

41 of 45

S-1

W-2

S-1

W-2

NOTE: VIEW FROM OUTSIDE.

NOTE: VIEW FROM OUTSIDE.

Screw two S-1 screws through V-2 panel. Line up gripping channel on other side.  

Continue to screw until secure. Do not over tighten as it may damage the vent.

Repeat steps 9.2A through 

9.2C to prepare three more vents.

From inside, hold Window Opener closed against vent. Slide vent at an angle through opening in 

roof panels. Hook top lip of vent 

onto curve in ridge 

profile R-1. 

Outside of vent rests on top of ledge on W-2 profile. Open vent to attach the other arm of  

opener to top of inside W-2 profile. Position with arm overlapping trim so adjusting screw can  

move freely. Screw two S-1 screws through panel and into gripping channel on other side to  

secure. Do not over tighten as it may damage the vent. 

From inside screw S-6 screw and spacer into the holes  

on each end of the top of the vent. This will secure the vent to the greenhouse in windy conditions.

Repeat steps 9.3A  through 9.3B to install three 

more vents.

Repeat steps 9.4A to 

secure three more vents.

9.2c

9.2D

9.3A

9.3B

9.4A

9.3c

9.4B

NOTE: VIEWS FROM INSIDE.

NOTE: VIEWS FROM FRONT

NOTE: VIEWS FROM INSIDE.

NOTE: VIEWS FROM INSIDE.

gripping 
channel

V-2

V-2

S-1

4

Gripping Channel

QTY

S-1

8

Connector

QTY

V-2

R-1

V-2

R-1

gripping 
channel

gripping 
channel

V-2

W-2

4

Gripping Channel

QTY

S-1

8

Connector

QTY

V-2

W-2 

R-1

S-6

S-6

S-6

V-2

V-2

S-6

S-6

8

Connector

QTY

NOTE: Make sure arm A overlaps aluminum trim on W-2

Содержание Mont-20-BK

Страница 1: ...65 Fleetwood Drive Rockaway NJ 07866 Customer Service 877 373 3078 Email customerservice rsiww com After Hours Helpline 443 574 4764 8 x 20 Greenhouse Assembly Instructions Monticello Made in the USA...

Страница 2: ...osed In cooler snow prone climates Cut some 2 x 4 s and put them against the roof ridge and the floor to help add support from heavy snow and ice This is just a precaution but could save a lot of aggr...

Страница 3: ...so applies to any implied warranties that may exist under applicable law Some jurisdictions do not allow limitations on how long an implied warranty lasts so the above limitation may not apply to the...

Страница 4: ...t in one staging area The List of Parts has the corresponding step number referenced to each part so you can easily prepare for each step We recommend placing all parts in one staging area Lay out par...

Страница 5: ...a cool dark place such as a garage until you are ready to use them Make sure the greenhouse complies with local building codes Heat the greenhouse during winter months to avoid accumulation of snow o...

Страница 6: ...ill be 101 by 247 Materials Four 10 pressure treated 2x4 lumber cut to 97 Four 10 pressure treated 2x4 lumber uncut at 120 Four 14 pressure treated 2x4 lumber cut to 123 Ninety five 8 3 wood screws Ma...

Страница 7: ...leave the roof unattended until it is completely assembled Place all like parts together in a staging area Prepare for each step according to instructions in this manual If any parts are missing or da...

Страница 8: ...2 Step 10 E 4 1 Step 10 B 2 5 Step 3 5 B 3 53 Steps 2 3 4 5 10 B 4 27 Step 8 B 5 24 Steps 1 2 4 7 B 7 6 Steps 5 6 7 B 8 4 Step 1 B 10 8 Step 7 B 1 6 Step 6 Door Profiles QTY QTY Profile 24 x 57 W 1 4...

Страница 9: ...nchors Brace Trim Plates Connectors Vent Opener QTY QTY QTY QTY QTY QTY QTY QTY T 3 T 4 G 3 A 1 A 2 B 9 T 2 S 10 1 4 4 10 10 4 1 1 Steps 2 3 4 Step 8 Step 8 Step 11 Step 11 Step 8 Steps1 2 3 4 5 6 7 8...

Страница 10: ...e knocked around during installation On vertical profiles you will place bracket in place and push the T b through slot The T bolt will lock i On horizontal profiles the T bolts may be slotted into th...

Страница 11: ...own Position P 2A and P 2B profiles at back sides of the greenhouse 1 1 WARNING Use extreme caution when handling profiles P 1A P 1B P 2A and P 2B The bottoms may have sharp edges near the drilled hol...

Страница 12: ...sure you have the correct number of T bolts in the correct bolt track in each profile The profiles have different amounts of T bolts on the inside and outside bolt tracks 1 2 NOTE Instructions identif...

Страница 13: ...from inside corner Equal measurements ensure the base is square Use a spirit level to make sure the base is level 1 4A Locate predrilled holes in base profiles Use six S 4 screws one at each corner a...

Страница 14: ...t facing outside The panels will help hold the profiles up during assembly 2 1B Continue working from inside Remove plastic film from both sides of one W 1 panel Fit panel into channel in base and cor...

Страница 15: ...into place and use two B 3 connectors with T bolt assemblies as shown to secure to base F 7 B 3 B 3 Slide four T bolts into bottom bolt track of G 1 gutter profiles Hand tighten each end T bolt to ho...

Страница 16: ...it for G 1 gutter profile G 1 W 1 F 7 F 7 G 1 W 1 S 7 2 Working from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile...

Страница 17: ...s on the outside of the greenhouse The B 3 connector uses the T bolt in the center hole of B 5 connectors at seams Loosen and slide T bolts to line up with connectors making sure the seams line up and...

Страница 18: ...56 72 QTY Connector B 3 S 2C S 7 2 4 2 Panels QTY W 1 2 24 x 57 3 1a Working from inside remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing...

Страница 19: ...ofile against spacer Repeat step 3 1C to secure WWW RSIWW COM 17 of 45 QTY Profile F 8 1 72 QTY Connector B 3 S 2C S 7 1 2 1 Panels QTY W 1 1 24 x 57 NOTE VIEW FROM INSIDE NOTE VIEW FROM outSIDE 3 2 R...

Страница 20: ...dge of F 1 and F 7 vertical profiles Profiles will fit snugly 3 3A Working from inside right corner place F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F...

Страница 21: ...ntract depending on the temperature To ensure proper placement use the 23 1 8 inch spacer included with the tools Continue working from inside back left corner Remove plastic film from both sides of o...

Страница 22: ...k Hand tighten end T bolt to hold in place Working from inside place G 1 and G 2 gutter profiles fitting top edge of W 1 panels into channels of gutters Place one short G 1 gutter profile at each end...

Страница 23: ...er hole of B 5 connectors at seams Loosen and slide T bolts to line up with connectors making sure the seams line up and the gutters remain straight Beginning at the seams arrange T bolts so middle bo...

Страница 24: ...xactly as shown Use Phillips screwdriver to tighten S 7 bolts to hold D 8 hinges in place Turn profiles over Slide six T bolts into bolt track of both profiles and position as shown Fit B 2 connector...

Страница 25: ...rner profile Position right F 8 profile so single T bolt is next to base on inside and the cut edge angled down toward the nearest corner when installed B 2 connector is pointing towards door opening...

Страница 26: ...next to base on inside and the cut edge angled down toward the nearest corner when installed B 2 connector is pointing towards door opening Fit panel into channel in F 8 profile and slide F 8 profile...

Страница 27: ...embly into the top slot of the B 2 place the B 2 in position and adjust T bolts to fit B 2 connector Secure with two additional S 2C caps Prepare D 7 latch Fit S 8 bolts in holes in D 7 latch Line up...

Страница 28: ...ide Position door frame so barrel latch is on outside Loosen set screws on ends of F 5 profile and adjust position to fit holes in B 2 connector Secure with two bolts Ensure height to base is 68 Remov...

Страница 29: ...end touches top of G 1 gutter Position both F 7 profiles Use C 1 connector with three T bolt assemblies to secure each outside corner Make sure all profiles line up flush against each other Repeat on...

Страница 30: ...B 1 connector with one T bolt assembly 6 1A Working from inside place F 2 profile on F 1 profile Make sure profiles are straight 6 1b From inside add connector B 7 to each corner Secure each with two...

Страница 31: ...its against cut angle of F 8 profile One end touches top of gutter and top end touches edge of F 2 center profile Position both F 7 profiles Use C 1 connector with three T bolt assemblies to secure ea...

Страница 32: ...es in B 5 connector Position B 5 connector with the long hex bolt in center hole and center to the seam where the profiles join Repeat step 7 1 to install remaining two R 1E profiles next to R 1E prof...

Страница 33: ...ofiles Turn the roof ridge over so bolts face down and rest on top of front and back walls 7 3A Working from outside ensure all pieces are still flush and secure roof ridge to front Loosen set screws...

Страница 34: ...roof Do not leave roof unattended until it is completely assembled The roof panels are installed in the sections shown below Use two people and a step ladder to assemble the roof Place step ladder in...

Страница 35: ...in back left corner Fit one F 1 profile next to right panel F 1 profile rests against widest part of roof ridge and lines up with top of gutter Hold two profiles together at ridge using one B 4 connec...

Страница 36: ...rked UV Resistant facing outside install the next panel on the right at the back Push panel into roof ridge channel until the other end rests on gutter ledge and then slide towards F 1 profile at back...

Страница 37: ...l into roof ridge channel until the other end rests on gutter ledge and then slide towards F 1 profile at back Continue working from back to finish section three Remove plastic film from both sides of...

Страница 38: ...bolt assembies 8 6f R 1 F 1 F 1 B 4 8 6A NOTE VIEW FROM OUTSIDE NOTE VIEW FROM OUTSIDE Remove next bungee cord and continue working from back to install section four Remove plastic film from both sid...

Страница 39: ...el on left Remove final bungee cord and repeat steps 8 8D through 8 8F to install next two W 1 panels and F 1 profiles W 1 W 1 W 1 8 7C Hold two profiles together in place at ridge using one B 4 conne...

Страница 40: ...anel and repeat step 8 8B to install in second section from back left NOTE VIEWS FROM OUTSIDE F 1 F 1 F 1 W 1 W 2 8 8B Remove plastic film from both sides of one W 2 panel It will be installed opposit...

Страница 41: ...S 2C caps The G 4 and G 4E trim plates snap into G 1 and G 2 gutter profiles to hold roof panels in place Working from outside begin at front corner Run a bead of silicone sealant along ledge of G 1 a...

Страница 42: ...f necessary Secure with a threaded stud on each side Repeat steps 9 1A through 9 1D to prepare the three more Automatic Window Openers Remove plastic film from both sides of V 2 factory assembled vent...

Страница 43: ...justing screw can move freely Screw two S 1 screws through panel and into gripping channel on other side to secure Do not over tighten as it may damage the vent From inside screw S 6 screw and spacer...

Страница 44: ...Begin right door assembly Prepare one E 2 door profile Position with holes facing up Slide one D 9 corner connector into each end Slide E 1 door profiles into D 9 corner connectors and secure each wit...

Страница 45: ...in step 10 6B Turn door over and install handle on E 2 profile just secured Match two holes in E 2 with holes in D 6 handle Secure with two S 10 screws Repeat step 10 1 through 10 2A to assemble left...

Страница 46: ...and F 5 profiles that make up the door frame and to inside E 1 bottom door profiles This tape acts as insulation Make sure it is smooth and even Working from inside with left door open and right door...

Страница 47: ...platform until each screw is flush with base profile Continue process around outside and inside until greenhouse is evenly secured Attach anchor bracket with two T bolts in the inside bolt channels in...

Отзывы: