Riverside Hydronics 1000 WBX 125A-IFC Скачать руководство пользователя страница 17

17 

34-56   07/13 

The following vent information is provided for use in design calculations, if needed. 

 

Venting Specifications 

Boiler 

Input Mbtu 

Combustion Air 

Volume (cfm) 

Max Vent 

Press. “W.C. 

399 136 

0.5 

500 170 

0.6 

650 221 

0.8 

750 255 

1.0 

850 289 

1.2 

900 306 

1.2 

1000 340 

1.3 

 

8.4  Vertical or Horizontal Vent Termination 

The vent terminal must extend at least 3 ft (.09 m) above the highest point where it passes through the roof of a 
building and at least 2 ft. (.06 m) higher than any portion of a building within a horizontal distance of 10 ft. (3.0 m). 

   

The vent cap must terminate at least 3 feet (0.91 m) above any forced air inlet within 10 feet (3.05 m); 4 feet (1.22 m) 
below, 4 feet (1.22 m) horizontally from or 1 foot (0.3 m) above any door, window or gravity air inlet to the building; 1 
foot (0.3 m) above grade; 1 foot (0.3m) above normal snow levels and shall terminate at least 7 feet (2.13 m) above 
grade when located adjacent to public walkways or gathering areas. 

   

The vent terminal should not be installed closer than 3 feet (0.91 m) from an inside corner of an L-shaped structure. 

 
8.5 Combining 

Category 

IV 

Vents 

 

Combined Centauri or Centauri Plus Category IV gas vent systems must incorporate an Exhausto or Tjernlund 
variable speed, modulating, mechanical draft inducer capable of maintaining the appropriate negative draft at the end 
of the common flue, to assure that all boilers in the combined vent system operate with a negative draft. 

Do not 

exceed negative 0.25” W.C.

 See “Combining Vents with a Draft Inducer

” 

illustration below. 

 

WARNING: Do not connect multiple boiler vents into a single unpowered or fixed speed powered vent.  This 
could cause unsafe operation and the potential for poisonous carbon monoxide to enter occupied areas.  
Such improper installation can cause property damage, personal injury, exposure to hazardous materials or 
loss of life. 

 

 

Conventional Venting 

Through the Wall Venting 

Combining Vents with a Draft Inducer 

 

 

 

 

 

Содержание 1000 WBX 125A-IFC

Страница 1: ...THIS EQUIPMENT READ AND FOLLOW THE INFORMATION IN THIS MANUAL AND ALL OTHER PROVIDED INSTRUCTIONS LABELS AND MARKINGS BEFORE INSTALLING OPERATING OR SERVICING THIS UNIT TO THE INSTALLER After install...

Страница 2: ...5 Temperature Control Sensor Install in system return piping 5 6 Filling the Boiler 6 Gas Supply Piping 6 1 Inlet Gas Pressure 6 2 Manifold Gas Pressure 6 3 Gas piping Size 6 4 Appliance Isolation dur...

Страница 3: ...rovides Modulation control through a 4 to 20 milliamp 11 3 Modbus Application for TempTrac 11 4 Boiler Management System BMS Remote Connections 11 5 Outdoor Reset 11 6 OnTrac Boiler Management System...

Страница 4: ...shut the main gas supply valve to the appliance from a location safely away from the emergency Failure to follow these instructions can cause property damage personal injury and exposure to hazardous...

Страница 5: ...h manual reset on high limit temperature control Manual reset electronic low water cutoff with test switch no lockout on power loss Pressure gauge on tank High and low gas pressure switches CSD 1 comp...

Страница 6: ...6 34 56 07 13 3 PRODUCT DESCRIPTION Component Controls and Connection Locations Locations May Vary 125 SERIES...

Страница 7: ...7 34 56 07 13 250 SERIES...

Страница 8: ...e unit and field installed devices must be made with type T copper wire Line voltage wire exterior to the appliance must be enclosed in approved conduit or approved metal clad cable To avoid serious d...

Страница 9: ...ecommended Building flow may have to be limited to only the firing boilers during periods of low building heat demand to prevent temperature from reaching the boiler s operating limit It is recommende...

Страница 10: ...filled with renewable crushed limestone becoming neutralized thus avoiding chemical treatment or dilution using substantial quantities of tap water To obtain a Condensate Neutralization System please...

Страница 11: ...ady flow of water is observed Close valve and complete filling the system 2 In hard water areas water treatment should be used to reduce introduction of minerals into the system Excessive buildup of m...

Страница 12: ...raight Pipe to add the equivalent straight pipe for each elbow or tee to obtain the total distance from the meter Use this corrected total distance from the meter for determining the suggested pipe si...

Страница 13: ...ntify the emergency shut off device 6 A sediment trap drip leg MUST be provided in the inlet of the gas connection to the unit 7 The code compliant vent limiters are designed and must respond to press...

Страница 14: ...less than 100 square inches 0 06 m2 Combination Of Air From The Indoors And From The Outdoors Refer to National Fuel Gas Code ANSI Z223 1 and or CAN CSA B149 Installation Codes or applicable provisio...

Страница 15: ...Specifications Boiler Input Mbtu Required Air SCFM 399 87 500 108 650 141 750 163 850 184 900 195 1000 217 7 3 Remote Combustion Air Cap A UL Listed air intake vent termination cap MUST be attached t...

Страница 16: ...nts and support horizontal lengths of vent and follow all installation instructions required by the vent manufacturer 8 3 Maximum Category IV Vent Length Equivalent Length A vertical or horizontal rem...

Страница 17: ...t 7 feet 2 13 m above grade when located adjacent to public walkways or gathering areas The vent terminal should not be installed closer than 3 feet 0 91 m from an inside corner of an L shaped structu...

Страница 18: ...e Section IV is installed in the tank Caution Do not install a reducing coupling valve or other restriction in the relief valve s discharge line The discharge line shall allow complete drainage of the...

Страница 19: ...ng Probe 1 This is used to regulate the temperature of the boiler 10 4 Control Buttons SET Displays and modifies the temperature set points In programming mode it selects a parameter or confirms an op...

Страница 20: ...will hold at low fire until parameter St4 is reached causing burner to modulate higher or parameter St1 is reached causing the burner to shutoff St4 The Modulation Threshold This additional different...

Страница 21: ...int Push the SET key The upper display will show the St1 parameter name while the lower display will show its value Use the UP or DOWN key to cycle through the parameter names Push the SET key to modi...

Страница 22: ...ected or is reading correctly Outdoor reset disabled Warm weather shutdown disabled Check wiring and sensor Terminals 16 17 HA High temperature limit setpoint exceeded Buzzer sounds operation continue...

Страница 23: ...sy chain arrangement 11 4 Making BMS BAS remote connections for analog and binary on off signals A terminal strip for the remote connection is located behind the hinged control panel at the top of the...

Страница 24: ...adjusted upward by the amount of the rr1 value See Outdoor Reset Manual 34 400 6 for full description Factory Default Settings The values of the Outdoor Reset and Warm Weather Shutdown functions in th...

Страница 25: ...and proving terminals for system pumps and combustion air 11 7 BAS Protocol Gateways When communicating over a network connection the standard protocol of the TempTrac control is Modbus RTU The standa...

Страница 26: ...the differential air switch to close the 15 second pre purge delay will start b During this period any flue products or combustible gases which may have settled in the boiler are evacuated 5 Heat Up F...

Страница 27: ...ion d As heat is transferred to the building the boiler loop temperature will fall below the set point The TempTrac will sense this condition and begin the call for heat sequence again 9 Flame Safegua...

Страница 28: ...al Hand Tools 13 3 Resources Product Installation Maintenance Manuals Start up Report with instructions Local State Federal Codes Toll Free 24 Hour Technical Support 1 800 433 5654 13 4 On Site Consid...

Страница 29: ...ng the rocker switch on the front of the control enclosure assembly When the burner fails to light the flame control will lockout Start the burner in Low Fire Burner combustion must be optimized at bo...

Страница 30: ...in the flue vent approximately two feet from the appliance See Gas Train Illustration below for details With the burner firing and adjusted to low fire adjust the regulator screw clockwise to increas...

Страница 31: ...LATOR VALVE ORIFICE ADJUSTMENT Gas Train Illustration for Centauri Models 250 through 500 REGULATOR ADJUSTMENT HIGH GAS PRESSURE SWITCH DUAL SAFETY SHUTOFF VALVE LOW PRESSURE GAS SWITCH MANIFOLD PRESS...

Страница 32: ...for proper blower pressure setting adjust if required Air switch may be defective Blocked Filter Switch Check for 24V at the N C side of the blocked filter switch Replace filter or switch as required...

Страница 33: ...33 34 56 07 13 15 REPLACEMENT PARTS REPLACEMENT PARTS...

Страница 34: ...34 34 56 07 13 15 1 Control Panel...

Страница 35: ...316SS 1 EA 8 102163 PROBE THERMOSTAT DIXELL 18NB NTC 25FT NICKEL BRASS 1 EA 9 104195 PROBE THERMOSTAT DIXELL 18NB NTC 5FT NICKEL BRASS 1 EA 10 116458 RELAY SPST 30A 24V OMRON G7L 1A TUB J CB AC24 N O...

Страница 36: ...36 34 56 07 13 15 3 Burner Assembly...

Страница 37: ...163 ELL BLACK 90DEG 1 16 2 5973 NIPPLE BLACK 1 4 X 2 17 1 101216 SWITCH PRESSURE HGP G ANTUNES 8101111202 2 20 W 18 1 101201 SWITCH PRESSURE LGP G ANTUNES 8103116202 1 20 W 19 1 SEE BOM NIPPLE BLACK 1...

Страница 38: ...n or installer should use the procedures described in item 5 6 below 3 Any sign of soot on the heat exchanger or in the flue indicates the need for a combustion inspection Properly installed and adjus...

Страница 39: ...combustion and ventilation air is unobstructed to the appliance 10 When electrical controls are serviced or replaced refer to ELECTRICAL COMPONENT LOCATIONS for identification and location of compone...

Страница 40: ...e detection system components c Check firing rate control d Check piping and wiring of all interlocks and shutoff valves e Inspect burner components f Check igniter g Test high and low gas pressure in...

Страница 41: ...41 34 56 07 13...

Страница 42: ...42 34 56 07 13 Riverside Hydronics LLC 990 Haltom Road Ft Worth TX 76117 1 800 990 5918 www riversidehydronics com...

Отзывы: