Riverside Furniture 29384 Скачать руководство пользователя страница 3

Made in Viet Nam

Riverside

FURNITURE

email:    [email protected]

Page 3 of 4

R1

Modern Gathering Two

Platform King Bed

 Assembly Instructions

ASSEMBLY STEPS :
To  prevent  possible  damage  to  furniture

and  personal  injury,  it  is  required  that
two  people  are  used  to  perform  the
following steps.

6.  Place the Platform Footboard (F-A) and

Bed  Rails  (R-A)  face  down  on  a  clean
and soft surface.

7.  Carefully  position  the  dowels  in  the

front end of one Bed Rail (R-A) onto the
appropriate holes on the Footboard and
connect with the Allen Bolts (R1), Lock
Washers  (R2),  Flat  Washers  (R3)  .
Tighten  all  Bolts  using  the  Allen  Key

(R4). (See Detail C). Repeat for the other

Bed Rail.

8.    Carefully  turn  the Footboard  and  Rails

to  be  rightside  up  and  move  into
position in front of the Headboard.

9.  Carefully  position  the  dowels  in  the

back ends of the Bed Rails into the holes

on the front of the Headboard. Connect
using  the  same  Bolts  and  Washers  as
used in previous Step. Tighten with the
Allen Key (R4). (See Detail D)

R4

R1

R3

R2

R-A

R-A

F-A

R3

R2

R4

Отзывы: