background image

 

 

ASSEMBLE DOOR 

SELECT: 
 

2 x 1.810 m Door Sheets (Narrow) 
2 x 0.945 m  Door Top/Bottom Flashings 
2 x 1.810 m Door Side Flashings 
3 x Hinges 
1 x Padbolt Support Flashing 
2 x 1.160 m  Door Brace Flashings 
54 x Rivets 

STEP 1: 

 



Lay out door sheets on a flat surface 
making sure narrow pans are on the 
outside. 

 



Rivet sheets together in the centre en-
suring ends are flush with each other. 

STEP 2: 
 



Position door side flashings and top 
and bottom flashings and assemble 
door as shown. 

 



Drill and rivet as per diagram. 

 

STEP 4: 

 



On the back of the door, place door braces in posi-
tion as shown in fig.3. 

 



Ensure that the top and bottom ends of the braces 
are under the door flashings as shown in fig.4. and 
opposite ends of the braces overlap in the middle. 

 



Rivet door brace flashings onto back of door as 
shown. Where possible, rivet from front of door

.

 

fig.1 

STEP 3: 

 



Attach hinges to door side flashing using rivets provided. 
Ensure hinge is flush with back of door, and 60mm in from 
each end as per fig.2. 

 



Using one rivet, attach padbolt support as shown in fig. 1. 

NARROW PANS 

fig.3 

fig.4 

fig.2 

Содержание Duratuf SS2010

Страница 1: ...ASSEMBLY INSTRUCTIONS SS2010 BASE SIZE 2 020m x 1 020m...

Страница 2: ......

Страница 3: ...EQUIREMENTS Following are the minimum requirements for cladding used in Sentry Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above Afte...

Страница 4: ...e Flashing 2 055m 1 Door 3 4 Sheet 1 810 m 2 Barge 1 110 m 2 TIMBER Padbolt Support 0 140 m 1 Bottom Plates H4 Green Front Back 2 020 m 2 Spouting 2 055 m 1 Bottom Plates H4 Green Sides 1 020 m 2 HARD...

Страница 5: ...om Plate Side Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Sheets Door Side Flashing Padbolt Support Hinge Door Brace Door Top Bottom QUICK OVERVIEW 1 LAY FOUNDATION 2 ASSEMBLE...

Страница 6: ...g through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom p...

Страница 7: ...flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the braces ar...

Страница 8: ...then nail along the wall sheet to the Top Plate two clouts per pan see fig 1 STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring each side of wall sheets overhangs the end of Bottom...

Страница 9: ...e wall sheets overhang the Top Plate by 15mm as shown Check that the Top Plate is straight then nail wall sheets to the Top Plate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Pla...

Страница 10: ...nges to the Door Jamb Flashing ensuring door closes properly Fit remaining rivets STEP 3 Place 2 x Wall Sheets on timber Ensure that the top of the sheets are flush with the top of the Top Plate and t...

Страница 11: ...panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 75mm screws screw the Top Plates together Using 4 x 40mm screws screw the Bot tom Pla...

Страница 12: ...sides The Clear Roof Panel must be secured to the front and back Top Plates Pre drill and fasten with the 40mm weatherseal nails provided SELECT 4 x 1 110 Roof Sheets 1 x 2 055 Spouting 2 x 1 110 Bar...

Страница 13: ...the Bottom Plate and the concrete slab A 10mm masonry drill bit is required OPTIONAL SENTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm...

Страница 14: ......

Страница 15: ...less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fasten...

Отзывы: